Presentation is loading. Please wait.

Presentation is loading. Please wait.

City of Gooding Town Hall Meeting October 2, 2013.

Similar presentations


Presentation on theme: "City of Gooding Town Hall Meeting October 2, 2013."— Presentation transcript:

1 City of Gooding Town Hall Meeting October 2, 2013

2 2 OLD SYSTEM November 5, 2013 BOND ELECTION Bond = $5,000,000 NEW RELIABLE SYSTEM Objectives OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

3 3 Old System  Non-potable irrigation system  Drinking water system OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

4 4 Old System  Non-potable irrigation system Deteriorated beyond repair Continued use is not practical  Drinking water system Non-compliant OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

5 5 New Drinking Water System  Water Facility Planning Study (WFPS) Evaluate existing system Develop alternatives to improve the system Select preferred alternative  Design selected alternative  Project Construction OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

6 6 New Drinking Water System  Existing water system Insufficient water rights Current Maximum Day Demand: 2,264 gpm OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Ground Water Rights 3,164 gpm Well Pumping Capacity 3,543 gpm Redundant Supply 2,025 gpm

7 7 New Drinking Water System  Existing water system Insufficient water rights OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Ground Water Rights 3,164 gpm Well Pumping Capacity 3,543 gpm Redundant Supply 2,025 gpm Max Day Demand 2,264 gpm

8 8 New Drinking Water System OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS By 2017 demand is greater than redundant supply while using gravity irrigation system

9 9 New Drinking Water System OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Preferred alternative – Alternative 3A

10 10 New Drinking Water System OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS  Estimated increase in monthly user rates Alternative 3A eliminates yearly gravity irrigation charge of $39.91/lot/year

11 11 Selected Alternative Cost OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Aquifer Recharge project – Water Rights – additional Transmission Improvements

12 12 New Drinking Water System OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS

13 13 NEXT STEPS OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Town Hall Meeting October 29, 2013 @ 7:00-9:00 PM Bond Election November 5, 2013

14 14 THANK YOU! OCTOBER 2, 2013 CITY OF GOODING WATER SYSTEM IMPROVEMENTS Gooding Mayor and City Council Walt Nelson, Mayor Vern France Mitch Arkoosh Diane Houser Mel Magnelli Keller Associates, Inc. Jim Mullen, P.E. Oksana Roth, E.I. (208) 238-2146


Download ppt "City of Gooding Town Hall Meeting October 2, 2013."

Similar presentations


Ads by Google