Download presentation
Presentation is loading. Please wait.
Published byAugustus Welch Modified over 9 years ago
1
TURAS Work Package 4 Climate change resilient city planning and climate-neutral infrastructure
2
2 Task 4.1- Kick-off meeting Finished June 2012 in Rotterdam Several case study reports ready to go online
3
3 Task 4.2 - Urban planning and adaptation to flood risk Flood risk model and damage-reducing measures Paper Regional Environmental Change published
4
4 Task 4.2 - Urban planning and adaptation to flood risk Extending the model: Elco Koks Spatial adaptation measures (paper resubmitted) Flood risk in harbour area Indirect economic effects Infrastructure
5
5 Task 4.2 - Urban planning and adaptation to flood risk Regional waterways Study finished Nick disseminating to decision makers
6
6 Task 4.2 - Urban planning and adaptation to flood risk Change of staff in Ljubljana team Ecosystem technologies Retention, quality, biodiversity, nutrient recycling, recreation education Editorial paper on website Demonstration site Podutik
7
7 Task 4.3 - Urban planning support through land use modelling Urban services in Rotterdam: Marthe Derkzen Mapping supply and demand of urban ecosystem services in Rotterdam Air quality Survey to investigate value associated with services
8
8 Task 4.4 - Urban water management Model storm water attenuation of green roofs Feeds off results of WP2 (task 2.5) In meantime: literature review and data gathering Includes social justice implications Social justice also explored in Rotterdam w.r.t. flooding; and Aalborg w.r.t. heating
9
9 Task 4.5 - Improved climate-neutral infrastructure Energy infrastructure (Aalborg) Create heat atlas for Aalborg to increase efficiency and enable analysis for renewable options Case study report has been finished Post-doc that will perform main work to start second half this year
10
10 Task 4.5 - Improved climate-neutral infrastructure Transport infrastructure (Ljubljana) Initially looking at Intelligent Transportation System (ITS) Already implemented, now focussing on micro-communication between stakeholders (basically part of ITS) using interactive GIS Beta version is online; also other topics to be included
11
11 Task 4.5 - Improved climate-neutral infrastructure Waste infrastructure (Seville) Integrated Sustainable Waste Management (ISWM) Mainly investigated in developing countries, now in Seville Problems with local partner Sevilla Global From 11 to 3 departments, many staff gone Will be part of Corporation of Municipal Enterprises this summer Delay in progress of task Surveys out, now decision to focus on industrial area
12
12 Task 4.6 – Recomm. for climate change resilient city planning Started drafting framework at kick-off meeting, continued in Stuttgart Framework and table of content of final deliverable will be further developed in Q2/Q3 of 2013 Several aspects to be covered by all partners (incl. governance/implementation)
13
13 Deliverables/Milestones 1 Deliverable in M36: D4.5 – Report on climate change resilient city planning 2 Milestones in M18: MS19 – Stakeholder inventory MS20 – Mapping flood risk and outline of flood management strategies
14
14 Topics to discuss with SG Timing Aalborg Timing London Changes in Ljubljana ITS to GIS platform for microcommunication Water management towards ET Seville Local partner SG -> Corporation of Municipal Enterprises Task -> focus on industrial area, rubberized asphalt and biogas used as examples
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.