Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Board of Education Work Session July 10, 2014 We promise to put children first!
2
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Agenda 1.Athletic Facilities Scope of Services and Costs 2.Kitchens Scope of Services and Costs Status 3.New Option Impact PK, K – 6, and 7 – 8 Grade Arrangement
3
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Summary of ImprovementsEstimated Costs Sports Complex$24,648,415 Middle Schools $9,015,418 High Schools$27,353,040 Total$61,016,873 Athletic Facilities
4
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Athletic Facilities Middle SchoolScope of WorkEstimated Cost Cloverdale Renovate physical educational area, construct a weight room, air- condition gym, expand locker rooms $1,358,818 Dunbar Lighting upgrade in gym, air-condition gym, resurface gym floor $259,000 Forest Heights Update locker rooms, gym lighting upgrade, air- condition gym $424,545 HendersonRenovate gym$837,017 MabelvaleNew gym$3,368,928 MannNew gym$3,368,928 Pulaski HeightsAir condition & renovate gym $757,000
5
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Athletic Facilities High SchoolScope of WorkEstimated Cost Scott Field Locker room facility, press box, renovate football field, add bleachers, concession stand $3,365,000 CentralNew gym, baseball team dressing room, field house $8,433,200 FairStadium bleachers upgrade, field house, gym air condition, press box for football, resurface track, renovate football field $4,265,000 HallAir- condition gym and a new field house $2,580,000 McClellanUpgrade football field, air- condition gym, lightning upgrades $1,226,000 ParkviewFootball stadium, new gym, air-condition gym $8,709,840
6
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Athletic Facilities Sports ComplexEstimated Cost 3 softball fields ($300,000 each )$900,000 Press box in the center of all 3$190,000 2 baseball fields ($350,000 each)$700,000 Press box between the two$175,000 Centrally located 4 large and 2 small locker rooms for baseball/softball $900,000 8 locker rooms (4 male/4 female – all sports) and laundry room $1,800,000 10 lane rubberized track$840,000 12 tennis courts$350,000 4 soccer fields (grass, not turf - $250,000 each) $1,000,000 Concession Stand (each – number of TBD)$150,000
7
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Athletic Facilities Sports Complex ContinuedEstimated Cost Archery Space$50,000 Storage Area$100,000 Pool/Athletic Complex Building including: Pool Driving Well Dressing Room Multi-Purpose Room Dance Room Wrestling Practice Area Competitive Gym for basketball Concession Stand Air Conditioning Commercial Kitchen $17,493,415 Total$24,648,415
8
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Kitchens Physical and equipment condition assessments are complete and are being reviewed by Child Nutrition Services 25 kitchens are not air-conditioned Improvements range from expanded kitchen areas, and larger student dining areas to new and upgraded equipment Fanning Howey and Child Nutrition Services staffs are finalizing the list of kitchen equipment improvements by school
9
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Pre-Kindergarten Centers, Grades K – 6, and Grades 7 - 8 Approximately 887 Pre-Kindergarten students to be accommodated if Pre-Kindergarten students are removed from elementary schools Requires 4 to 5 new Pre-Kindergarten Centers to be built or existing facilities converted to PK Centers Based on existing capacity, utilization, and/or student enrollment, 16 schools would not be able to support a Grade 6 addition. New Option
10
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Pre-Kindergarten Centers, Grades K – 6, and Grades 7 – 8 If Grade 6 is moved to elementary schools from middle schools, an estimated 1,836 Grade 6 students would have to be accommodated through a combination of utilization of vacant space and school additions. The removal of Grade 6 from middle schools will result in excess capacity at the middle school level. Cost savings at the middle school level will be exceeded to construct new Pre-Kindergarten Centers and the addition of classroom space at elementary schools. New Option
11
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Pre-Kindergarten Centers, Grades K – 6, and Grades 7 – 8 Larger additions may be required for student activity centers and kitchens/student dining than are currently planned for as other options are being considered. Based on the factors listed above, the planning team would not recommend including this as an option in the final plan. New Option
12
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Next Steps Draft plan will be prepared and presented by July 31 st Board of Directors work session to review the plan on August 14th Revisions following the work session to be incorporated by the end of August Community Meetings will be held to present final Facilities Master Plan Recommendations beginning in September Next Steps