Presentation is loading. Please wait.

Presentation is loading. Please wait.

Computer Connect Project Yakima School District EETT-ARRA Funded Project November, 2009 – November, 2010.

Similar presentations


Presentation on theme: "Computer Connect Project Yakima School District EETT-ARRA Funded Project November, 2009 – November, 2010."— Presentation transcript:

1 Computer Connect Project Yakima School District EETT-ARRA Funded Project November, 2009 – November, 2010

2 Instructional Issue Single computer classrooms Single computer classrooms LCD Projectors only connected to Document Camera LCD Projectors only connected to Document Camera Teachers lecturing from whiteboard or sitting next to document camera Teachers lecturing from whiteboard or sitting next to document camera Under utilized purchased curriculum materials on CD/DVD or online Under utilized purchased curriculum materials on CD/DVD or online Internet resources not included in instruction Internet resources not included in instruction

3 Other Issues Development of District Technology Plan Development of District Technology Plan New 25 member District Technology Team New 25 member District Technology Team District lacked Teacher Technology Integration and Proficiency Data District lacked Teacher Technology Integration and Proficiency Data One-Time funding (ARRA - Federal stimulus) One-Time funding (ARRA - Federal stimulus) Requirement: 25% of funding toward professional development Requirement: 25% of funding toward professional development

4 Plan Connect 200 classroom computers to LCD Projector and with remote control access Connect 200 classroom computers to LCD Projector and with remote control access Select schools based on free/reduced lunch Select schools based on free/reduced lunch Equipment Needed: video splitter, VGA cables, covers & wireless keyboard/mouse Equipment Needed: video splitter, VGA cables, covers & wireless keyboard/mouse Provide 1-hour of paid professional development (focus on wiring and instructional strategies) Provide 1-hour of paid professional development (focus on wiring and instructional strategies) Projected Costs per Classroom: Equipment $185 Professional Development: $50 Projected Costs per Classroom: Equipment $185 Professional Development: $50

5 Implementation Nine schools (7 Elementary, 2 MS) Nine schools (7 Elementary, 2 MS) Coordinate with Principals (flyers) Coordinate with Principals (flyers)flyers Registration by PILOT survey (Total: 208; 204 teachers) Registration by PILOT survey (Total: 208; 204 teachers)PILOT Teachers work in pairs to connect Computers Teachers work in pairs to connect Computers Internet Model instruction with wireless keyboard/mouse (provide samples) Internet Model instruction with wireless keyboard/mouse (provide samples)samples

6 Reporting Email request from OSPI (10/21/10) Email request from OSPI (10/21/10) Sent appeal to teachers for 2nd PILOT Sent appeal to teachers for 2nd PILOT Registration files and PILOT completion reports track teacher participation Registration files and PILOT completion reports track teacher participation Of the 204 participating teachers, 92 provided a post-intervention survey Of the 204 participating teachers, 92 provided a post-intervention survey Results Results Results


Download ppt "Computer Connect Project Yakima School District EETT-ARRA Funded Project November, 2009 – November, 2010."

Similar presentations


Ads by Google