Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 SIGSAC VIABILITY REVIEW Sushil Jajodia March 19, 2005.

Similar presentations


Presentation on theme: "1 SIGSAC VIABILITY REVIEW Sushil Jajodia March 19, 2005."— Presentation transcript:

1 1 SIGSAC VIABILITY REVIEW Sushil Jajodia March 19, 2005

2 2 PastPast Activities –2 yearly conferences (CCS and SACMAT) Member benefits –2 conference proceedings every year –Reduced registration fee

3 3 PresentPresent SIG Officers –Chair (Sushil Jajodia since July 2003) –Steering committee (Atluri, Faigin, Samarati, Sandhu)

4 4 CCSCCS CCS has become a week long event (M-F) 3 day conference with two parallel tracks (Research papers track, Govt/Industry papers and Tutorial track) Several co-located workshops (8 in 2004) Increasing submissions (17/64 in 1997 to 35/251 in 2004) Increasing participants (100 up to 2001 to 375 in 2004)

5 5 CCS Surplus YearCCS Surplus 2000$914 2001$27,962 2002$14,017 2003$53,044 2004$50,000 (expected)

6 6 Membership and Finances Stable membership –773 professional, 35 affiliate, 165 student, 1 institution Improving fund balance –June 01 $16,760 –June 02 $34,330 –June 03 $41,754 –June 04 $93,325

7 7 FutureFuture Elections –Chair: Sushil Jajodia, Virgil Gligor –Vice-chair: Pierangela Samarati, Paul Kendall –Treasurer/Secretary: Vijay Atluri, Chuck Youman Awards (Outstanding Innovation and Outstanding Contribution) High quality conference in Asia (Asia CCS) in March 2006


Download ppt "1 SIGSAC VIABILITY REVIEW Sushil Jajodia March 19, 2005."

Similar presentations


Ads by Google