Presentation is loading. Please wait.

Presentation is loading. Please wait.

Standards Review Subcommittee Update February 19, 2013.

Similar presentations


Presentation on theme: "Standards Review Subcommittee Update February 19, 2013."— Presentation transcript:

1 Standards Review Subcommittee Update February 19, 2013

2 2 Free Template from www.brainybetty.com 2 Meetings Recent Meetings: –November 13, 2012 –December 10, 2012 –February 11, 2013 Upcoming Meetings –March 14, 2013 –April 22, 2013

3 3 Free Template from www.brainybetty.com 3 Recent Activities Formal Comments: –WEQ 2012 Annual Plan Item 6.a - Develop standards to support PAP 10 - Standards Energy Usage Information, Phase 2, Harmonization with CIM and SEP 2.0

4 4 Free Template from www.brainybetty.com 4 Upcoming Activities Ongoing Activities –Review WEQ Recommendations, Interpretations, and Minor Corrections posted for Formal Comments –Glossary Coordination with Retail Glossary Subcommittee –Ongoing Cross Quadrant Review of: Standards Requests Minor Corrections Clarifications /Interpretations

5 5 Free Template from www.brainybetty.com 5 NAESB/NERC Standards Coordination NAESB WEQ Annual PlanNERC RSDP 1.(c) Disturbance Control Standard (DCS) (BAL-002) Coordination with NERC Subcommittee Complete: 2013 Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves Status: BOT approval not listed 1.(e) Develop and or modify business practices related to support of NERC effort on the NERC Resources and Transmission Adequacy Subcommittee Complete: TBD NERC Project 2009-05 Resource Adequacy Assessments Status: Candidate for dismissal 1.(f) Develop, modify or delete business practices to support Time Error, Automatic Generation Control (AGC), and Inadvertent Accounting (BAL-005, and BAL-006) Subcommittee Complete: TBD Project 2010-14.2 Phase 2 of Balancing Authority Reliability-based Controls: Time Error, AGC, and Inadvertent Status: Candidate for dismissal 1.(g) Coordinate with NERC on changes to definition of Bulk Electric System Subcommittee Complete: 4 th Q 2013 Project 2010-17 Definition of Bulk Electric System (Phase 2) Status: BOT approval

6 6 Free Template from www.brainybetty.com 6 NAESB/NERC Standards Coordination NAESB WEQ Annual PlanNERC RSDP 3.(a)(ii) Review and correct WEQ-004 Coordinate Interchange Business Practice Standard as needed based on activities in NERC Subcommittee Completion: 2014 Project 2008-12, Coordinate Interchange Standards Revisions Status: BOT approval 11/2013

7 7 Free Template from www.brainybetty.com 7 NAESB/NERC Standards Coordination WEQ PROVISIONAL ITEMS NAESB WEQ Annual PlanNERC RSDP 1.(a) Develop complementary standards that align with NERC Project 2008-01 Voltage and Reactive Planning and Control. Status: Provisional NERC Project 2008-01 Voltage and Reactive Planning and Control Status: BOT approval 11/2013 1.(b) Develop complementary standards that align with NERC Project 2010-4 Demand Data Status: Provisional NERC Project 2010-4 Demand Data Status: BOT approval 11/2013 1.(c) Coordinate with NERC on the functional model glossary revisions NERC Project 2010-08 Functional Glossary Model Revisions Status: Provisional Project 2010-08 Functional Glossary Model Revisions Status: BOT approval not listed 1.(d) Coordinate with NERC on NERC Project 2012-05 ATC Revisions - Order 729 Status: Provisional Project 2012-05 ATC Revisions - Order 729 Status: BOT approval 11/2013

8 8 Free Template from www.brainybetty.com 8 NAESB/NERC Standards Coordination NAESB WEQ Annual PlanNERC RSDP 1.(e) Coordinate with NERC on NERC Project 2012-08 Glossary Updates. Status: Provisional Project 2012-08 Glossary Updates Status: BOT approval 11/2013 1.(f) Coordinate with NERC on NERC Project 2012-09 IRO Review Status: Provisional Project 2012-09 IRO Review Status: BOT approval 02/2014 1.(g) Coordinate with NERC on NERC Project 2012-15 Flow Limited Paths Project 2012-15 Flow Limited Paths Status: BOT approval not listed 1.(h) Coordinate with NERC on Project 2013-02 Paragraph 81 (multiple phases) Status: Provisional 2013-02 Paragraph 81 Status: Phase 2 not a standalone project 1.(i) Coordinate with NERC on Project 2013-01 Cold Weather Preparedness Status: Provisional on Project 2013-01 Cold Weather Preparedness Status: BOT approval 11/2013

9 9 Free Template from www.brainybetty.com 9 Questions ?


Download ppt "Standards Review Subcommittee Update February 19, 2013."

Similar presentations


Ads by Google