I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011.

Similar presentations


Presentation on theme: "I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011."— Presentation transcript:

1 I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011

2 The Title Would be Placed Here Relief & new choices on I-95 Concurrent package of improvements: I-95 HOV/HOT Lanes Provide new choices, add capacity, extend and improve performance of existing HOV Department of Rail and Public Transportation Transit improvements Maximize benefit of growing HOT Lanes network by expanding bus service, Park & Ride lots VDOT Seminary HOV/Transit ramp Link HOV lanes on I-395 to growing Mark Center Seminary/Duke I-395 Auxiliary lanes Improved traffic movement on the regular lanes

3 The Title Would be Placed Here Environmental Assessment Draft NEPA document approved for public release by FHWA Interchange Justification Report Draft IJR report being finalized Technical Requirements Preliminary Design for Design Public Hearing Since March Transportation Committee Briefing

4 The Title Would be Placed Here Key Milestones Combined Design Public Hearing, NEPA and Transit Study Information Meeting September 26 th (Woodbridge) September 28 th (Springfield) September 29 th (Stafford) Finalize Environmental Document Finalize Interchange Justification Report Commercial Close Financial Close Construction as early as 2012 Construction approximately 3 years

5 The Title Would be Placed Here www.virginiahotlanes.com 1-855-895-4646 INFO@I-95HOTLANES.COM Regional Project and Traffic Information www.vamegaprojects.com www.vamegaprojects.com WWW.511 VIRGINIA.ORG Project Information Resources

6 The Title Would be Placed Here Auxiliary lane

7 The Title Would be Placed Here Mark Center HOV/Transit Ramp Delivered concurrently with HOV/HOT Lanes Links Seminary Road to I-395 Ramp restricted to HOV/transit No anticipated impact on Winkler Nature Preserve Environmental, traffic studies begin 2011 Construction as early as 2013

8 The Title Would be Placed Here Short & Intermediate Term Improvements