Download presentation
Presentation is loading. Please wait.
Published byCaroline Galloway Modified over 11 years ago
1
NANC Report NANC Training (NT) July 19, 2005 Beth ODonnell, Cox Communications Rosemary Emmer, Nextel
2
07/19/2005NANC Training Report2 Contents NT Mission NT Outline Next Steps Meeting Schedule
3
07/19/2005NANC Training Report3 NT Mission Contents The mission of the NANC Training (NT) ad hoc committee is to work collectively with the NANC members to develop a brief yet cohesive training document. This document will be delivered to the NANC members. New NANC participants will have a better understanding of the NANC protocol after reviewing this document. This project is short-term, with an expected end date of September 20 th, 2005.
4
07/19/2005NANC Training Report4 NT Outline Resources NANC Mission Statement Websites: FCC, NANC page, NANC Chair NANC, Working Group Guidelines
5
07/19/2005NANC Training Report5 NT Outline Logistics : Room Location/FCC Address/Date/Time/Dress Code (this is found in the Press Release sent by Debbie Blue) Ensure correct name/address is in the NANC Directory as to be added to Debbie Blues e-mail distribution list
6
07/19/2005NANC Training Report6 NT Outline Meeting Details Standing NANC report: –NANPA –PA –NAPM LLC –INC –NANP B&C –B&C WG –IMGs –SNAC –LNPA –NOWG –FoN WG
7
07/19/2005NANC Training Report7 NT Outline Meeting Details Microphone (ensure it is on by holding up hand) State your name and name of company before speaking or addressing the chairman Do not speak until acknowledged by the chairman Delivery of Reports (power point, etc.) Each entity has two NANC reps, a primary and an alternate – two voices one vote at each meeting
8
07/19/2005NANC Training Report8 NT Outline Modules NANC, Working Group Guidelines Consensus IMG vs Working Group Relationships: FCC, NANPA, PA, Billing and Collection Agent, NAPM, INC
9
07/19/2005NANC Training Report9 NT Outline Issue Management What types of issues does NANC manage? Policy vs.Technical How does an Issue come before NANC? FCC, NANC Members, State Regulators, Industry, Vendors, Dispute Resolution How does a Working Group resolve an issue? How does an IMG resolve an issue?
10
07/19/2005NANC Training Report10 Next Steps NANC Members, WG and IMG co-chairs to review the outline, send upgrades to Beth ODonnell (bethodonnell@comcast.net) Volunteers for ad hoc committee to attend a 1 hr conference call to provide input and talk about next steps
11
07/19/2005NANC Training Report11 Meeting Schedule Conference Call scheduled for: Tuesday, August 2, 2005 11:00am Eastern, 1 hr Nextel Bridge: 866-639-8255 Pin 0222
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.