Download presentation
Presentation is loading. Please wait.
Published byAlexandra Lancaster Modified over 11 years ago
1
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables
2
July 2002Project presentation REGNET 2 Contents General presentation and main figures Tasks Deliverables
3
July 2002Project presentation REGNET 3 WP2: situation WP1: analysis of state of the art and main concepts Definition of content to be provided Development of a documentation and digitalisation plan Identification of standards User requirements System specification Definition of the legal framework Business processes Identification of market and user groups WP2: implementation of the system and preparation of services and product generation Preparation of content and products System implementation, Development of the building blocs Integration into the REGNET system Settlement of the legal framework Business processes re-engineering Market preparation Work area A: content creation & management Work area B: platform engineering Work area C: enterprise engineering
4
July 2002Project presentation REGNET 4 WP2 description Implementation of the System and Preparation of Services and Product Generation: T2.1: Preparation of content and products (Work Area A). T2.2: System implementation; development of the building blocks; integration into the REGNET-System (Work Area B). T2.3: Setup of the legal framework (Work Area C). T2.4: Business process (re-) engineering (Work Area C). T2.5: Market preparation (Work Area C).
5
July 2002Project presentation REGNET 5 WP2 figures Leader: VALTECH Person/month: 144,5 Start: October 2001 End: April 2002 Deliverables: D4: Status Report: "Available Content and Products" D5: Prototype + documentation: "The REGNET - System: Version 1" D6: Status Report and Guidelines: "System Services and Business Processes"
6
July 2002Project presentation REGNET 6 Task 2.1: Preparation of content and products Previous task 1.2: Development of a documentation plan Objectives : Digital content to be available for the REGNET demonstration phase (objects, descriptions) Product catalogues in electronic form for museum shops
7
July 2002Project presentation REGNET 7 Task 2.2: System Implementation Version 1 Previous task: WP1: T1.4 specification Objectives: Risks validation and implementation of the first version of the Regnet system Portal, Ontology, Search & Retrieval, Data Generation, e-Shop, Product catalogue management, procurement, Electronic Publisher Standalone English only
8
July 2002Project presentation REGNET 8 Task 2.3: Setup of the legal framework Previous task: T1.5: Setup of the legal framework Objectives : Refinement of REGNET partnership model (e-Business aspects) Definition of REGNET set of agreements on national and international level Refinement of REGNET licensing and pricing model Establishing of a REGNET non-profit organisation
9
July 2002Project presentation REGNET 9 Task 2.4: Business process (re-) engineering Previous task: task T1.6: definition and organisation and mapped of the business process of the cultural heritage domain. Complete and detailed specifications of the selected processes to be implemented in version 2 of the REGNET System. Preparation for deployment of REGNET business processes into ebXML registry.
10
July 2002Project presentation REGNET 10 Task 2.5: Market Preparation Previous tasks: identification of market and user groups Objectives: Regnet Market Engineering plan Regnet Market Analysis Market analysis - checklist
11
July 2002Project presentation REGNET 11 D4: Available Content and Products Status of work at the side of the content providers Collections for the demonstration phase Preparation and conversion of data Data Entry Tools
12
July 2002Project presentation REGNET 12 D5: "The REGNET - System: Version 1" Prototype Documentation: design and software manuals: Core system design Prototypes Detailed design model for each component Implementation model Deployment plan Installation and software manuals
13
July 2002Project presentation REGNET 13 D6: System Services and Business Processes Set-up of a legal framework and partnership model Business Process (re-)engineering Market preparation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.