Presentation is loading. Please wait.

Presentation is loading. Please wait.

07/06/2001ZEUS Consulting SA1 Title: Work Package 1 Work Plan Status Anastasia Pagoulatou.

Similar presentations


Presentation on theme: "07/06/2001ZEUS Consulting SA1 Title: Work Package 1 Work Plan Status Anastasia Pagoulatou."— Presentation transcript:

1 07/06/2001ZEUS Consulting SA1 Title: Work Package 1 Work Plan Status Anastasia Pagoulatou

2 07/06/2001ZEUS Consulting SA2 Tasks examined: Task 1.1 Definition of content to be provided Task 1.3 Identification of standards to be used Task 1.4 Development of the system specification Task 1.6 Definition of supported business function Task 1.7 Identification of market segments and user groups

3 07/06/2001ZEUS Consulting SA3 Work Area A – Task 1.1 Definition of content to be provided Start: 01/04/01 End:30/06/01 (Leader: IMAC) Analysis of the available content from each partner Decide and define which objects or surrogates might attract potential users or could form a basis for follow up added value processing Decisions must be taken regarding: i. Which real goods or replicates will be offered ii. Which necessary logistics must be set properly (e.g. framing a painting) Work Delivered: Museumshops Best Practice First Draft on Collection Description and User Requirements

4 07/06/2001ZEUS Consulting SA4 Work Area B - Task 1.3 Identification of standards to be used Start: 01/04/01 End: 31/05/01 (Leader IAT) i. Metadata Systems i. Cross domain searching ii. Bibliographic, Archival, Audiovisual and museum information object ii. Protocol (Z39/50 / Communication Standard) iii. Data formats (XML) iv. E-Business (Standards, Models…) v. Multimedia (Authoring, storyboards and documents. Use of standards in electronic publishing)

5 07/06/2001ZEUS Consulting SA5 WORK DELIVERED Questionnaires on expertise by VALT, ICCS, SI, ZEUS, AIT, TARX and MOT Gathering and merging of reports from different partners - IAT WORK EXPECTED Final Report Work Area B - Task 1.3

6 07/06/2001ZEUS Consulting SA6 Work Area B - Task 1.4 Development of the system specification Start: 02/05/01 End: 30/09/01 Leader: VALT Definition of the Functional Requirements Development of the REGNET Architectural design Identification of Software Components Detailed System Design Definition of hardware system Network requirements Identification tools

7 07/06/2001ZEUS Consulting SA7 DIAGRAM OF WP1

8 07/06/2001ZEUS Consulting SA8 Work Area C - Task 1.6 Definition of supported Business Start: 01/04/01 End: 30/06/01 Leader: VALT Investigation must take place in this task, regarding: The workflow of business enterprises The integration of business process related to industrial production of digital goods Key point: develop a wide range of services provided by REGNET, all relevant with the core and support business process and functions related with all the cultural organizations participating

9 07/06/2001ZEUS Consulting SA9 Work Area C - Task 1.7 Identification of Market Segments and User Groups Start: 01/04/01 End: 30/06/01 Leader: TINC Identification of: Regnet Users: Individuals, Cultural Heritage organizations, Media industry, Publishing enterprises, etc. Market Segments: Education, (Cultural) Tourism, Science and Research, Recreational Economics, Administration (Multimedia) SMEs and Industries, Arts, etc. Market possibilities and new opportunities in the market environment


Download ppt "07/06/2001ZEUS Consulting SA1 Title: Work Package 1 Work Plan Status Anastasia Pagoulatou."

Similar presentations


Ads by Google