Download presentation
1
EMERGENCY EVACUATION
2
EMERGENCY EVACUATION DEMONSTRATIONS
Full-scale done by manufacturer Partial Evacuation Demonstration required for issuance of AOC Full complement of crew members 50% of slides deployed No passengers
3
PROCEDURES FOR PARTIAL EVACUATION DEMONSTRATION
Planning meeting to discuss exact procedures and criteria Require aircraft, flight crew and two complete cabin crew Conducted in darkness Aircraft electrical system powered Simulate preparation for takeoff Cabin attendants seated Simulate take-off roll then electrical failure Simulated fire to 50% of exits 15 secs to fully deploy the slides
4
EVALUATION OF EVACUATION DEMONSTRATION
Adherence by flight and cabin crew to assigned duty Effectiveness of PIC in exercise of command Succession of command in event of casualties Effectiveness of crew for evacuation duties Shortcomings, deficiencies or delays
5
DITCHING DEMONSTRATION
6
DITCHING Demonstration required for Type Certification
Full scale demonstration by manufacturer If aircraft not certified for ditching, extended overwater flights should not be authorized
7
PARTIAL DITCHING EVALUATION AREAS
Emergency training programme Ditching procedures Crewmember competency Equipment adequacy and reliability
8
PROCEDURES FOR DEMONSTRATION
Conducted during daylight All required crewmembers used Passengers used only if procedures require Simulate normal takeoff and climb to cruise Captain will order crew to prepare for ditching After 6 minutes simulated landing on water Observe life preserver donning and life raft removal One life raft will be selected for launch
9
EVALUATION OF DEMONSTRATION
Adequate equipment properly stowed Slides, life jackets, rafts inflate as required Crew use of correct procedures - training Timely evacuation of aircraft Time start to exit opening, life raft launched/inflated and when all rafts are boarded
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.