Download presentation
Presentation is loading. Please wait.
Published bySophia Mooney Modified over 11 years ago
1
Integra Consult A/S November 2005Karachi, Pakistan Safety Assessment Projects Karachi, Pakistan Integra Consult A/S
2
November 2005Karachi, Pakistan Regulator Regulator will, through the Regulatory Framework require that: Regulator will, through the Regulatory Framework require that: –The ANSP demonstrate that an acceptable level of safety will be met and users have been consulted.
3
Integra Consult A/S November 2005Karachi, Pakistan Regulatory Requirements Before we start Before we start –Acceptable levels of safety needs to be agreed (Safety Objective Classification Scheme - SOCS) –Appropriate SSA process needs to be agreed tailored to the type and complexity of the change How How –ANSP proposes an appropriate SSA process and associated SOCS prior to commencement of a procurement / change project –Regulator approve
4
Integra Consult A/S November 2005Karachi, Pakistan Regulatory Requirements When we finish When we finish –ANSP demonstrates that an acceptable level of safety will be achieved considering: Equipment Equipment People People Procedures Procedures –ANSP demonstrates that measures are in place for post-implementation monitoring
5
Integra Consult A/S November 2005Karachi, Pakistan Regulator ANSP User Project Regulatory Requirement SSA Targets Process Regulatory Approval Procedure SMS FHAPSSASSA System Req. System design Imple- mentation Accep- tance System Safety Case Regulatory Approval System Safety Endorsement Transition Safety Case Regulatory Approval System Certifi- cation SSA Plan FHA Report PSSA Report ICAO Provisions 2.26.2 As of 27 November 2003, the acceptable level of safety and safety objectives applicable to the provision of ATS within airspaces and at aerodromes shall be established by the State or States concerned. 2.26.5 Any significant safety-related change to the ATC system, including the implementation of a reduced separation minimum or a new procedure, shall only be effected after a safety assessment has demonstrated that an acceptable level of safety will be met and users have been consulted. When appropriate, the responsible authority shall ensure that adequate provision is made for post-implementation monitoring to verify that the defined level of safety continues to be met.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.