Presentation is loading. Please wait.

Presentation is loading. Please wait.

Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013.

Similar presentations


Presentation on theme: "Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013."— Presentation transcript:

1 Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013

2 Announcements Use Case 2.0 Working Session –Review Community Feedback on the following sections: Communities of Interest –Review Base Flows, Alternate Flows, Diagrams 2 Agenda

3 LCC HL7 Tiger Team SWG: SWG which will collaborate on LCC-related projects from HL7. Please join our meetings on Wednesdays at 11am ET –Information about the Tiger Team can be found on the wiki at: http://wiki.siframework.org/LCC+HL7+Tiger+Team+SWG http://wiki.siframework.org/LCC+HL7+Tiger+Team+SWG Lantana will be providing updates on their Implementation Guide development on the LTPAC calls starting Monday. Check out the LCC Use Case 2.0 Wiki Page (http://wiki.siframework.org/LCC+WG+Use+Case+2.0)http://wiki.siframework.org/LCC+WG+Use+Case+2.0 –We have a comment form to provide feedback on UC sections (http://wiki.siframework.org/LCC+Use+Case+2.0+Comments)http://wiki.siframework.org/LCC+Use+Case+2.0+Comments Meeting Reminders (next week) –LTPAC SWG meeting – Monday at 11am ET –LCC HL7 Tiger Team SWG meeting – Wednesday at 11am ET –LCP SWG meeting – Thursday at 11am ET 3 Announcements

4 DateItemHomework (Due Friday COB) 3/11 – 3/18/13 10.0 Scenario (User Stories, Base/Alternate Flow, Functional Requirements, Activity Diagram, Sequence Diagram) Review: User Stories 3/25 – 3/26/13 3.0 Use Case Scope (Background, In / Out of Scope, Communities of Interest) Finalize: User Stories, Base Flows, In Scope, Out of Scope Review: Communities of Interest, Assumption 4/1 – 4/2/13 3.0 Use Case Scope Communities of Interest Finalize: Communities of Interest, Assumptions, Pre- Conditions, Post-Conditions Review: Actors and Roles 5.0 Use Case Assumptions 6.0, 7.0 Pre-Conditions, Post Conditions 4/8/13Finalize: Assumptions, Pre-Conditions, Post- Conditions 8.0 Actors and Roles Review: Actors and Roles 4/11/13Review Community Feedback : Communities of Interest, Assumptions 8.0 Actors and Roles Finalize: Assumptions, Pre-Conditions, Post- Conditions, Actors and Roles 4/15/13Finalize: Communities of Interest, Assumptions, Actors and Roles Review: Base Flows, Use Case Diagrams, Activity Diagrams, Sequence Diagrams 4/18/13Review Base/Alternate Flows, User Stories Diagrams: Use Case, Activity, Sequence Finalize: Base Flows, Use Case Diagrams, Activity Diagrams, Sequence Diagrams 4/22/1311.0 Risks, Issues, and ObstaclesFinalize: Risks, Issues and Obstacles; Dataset Requirements 12.0 Dataset Requirements 4/25/13Appendices (if required)Finalize: Appendices, Use Case Diagram, Value Statement 4.0 Value Statement LCC Use Case 2 Development Schedule Items in italics will drawn directly from the LCC Project Charter or created offline directly from other sections and will be included in the end-to-end review

5 1.0 Preface and Introduction** 2.0 Initiative Overview –2.1 Initiative Challenge Statement** 3.0 Use Case Scope –3.1 Background** –3.2 In Scope –3.3 Out of Scope –3.4 Communities of Interest 4.0 Value Statement** 5.0 Use Case Assumptions 6.0 Pre-Conditions 7.0 Post Conditions 8.0 Actors and Roles 9.0 Use Case Diagram Use Case Outline 10.0 Scenario: Generic Provider Workflow –10.1 User Stories –10.2 Activity Diagram o 10.2.1 Base Flow o 10.2.2 Alternate Flow –10.3 Functional Requirements o 10.3.1 Information Interchange Requirements o 10.3.2 System Requirements –10.4 Sequence Diagram 11.0 Dataset Requirements 12.0 Risks, Issues and Obstacles Appendices –Related Use Cases –Previous Work Efforts –References 5 ** Leverage content from Charter Draft sections complete Content available for review

6 3.4 Communities of Interest: Review community feedback 10.1, 10.2.1, 10.2.2 User Stories, Base Flow, Alternate Flow: Available for review this week 9.0 Use Case Diagrams: In process 10.2 Activity Diagrams: In process 10.4 Sequence Diagrams: In process Status of current Use Case draft sections 6


Download ppt "Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013."

Similar presentations


Ads by Google