Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4.

Similar presentations


Presentation on theme: "Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4."— Presentation transcript:

1 Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4

2 SPLWG recognized Delta outflow as potentially significant pathway for contaminants Identified as a high priority information gap Study initiated in 2002 Background Item #4

3 *Contingency money used (15 samples) Samples Collected Item #4

4 370,000 cfs Delta Outflow from 12/20/05 to 01/25/06 Item #4

5 Load Estimates Item #4

6 Slope 0.22 Slope 0.11 - Low Flow Slope 0.29 - Tidal High Flow - Item #4 SSC – Hg Relationships Influence Loads

7 PCB Loads and Allocations Item #4

8 Hg Loads and Allocations Item #4

9 Sampling Budget Example 5–6 Storms 40 samples for Hg, PCBs, and sediment $35,000 20 samples for Hg speciation (HgD, MeHgT, MeHgD, Hg(II)) $10,000 Lab Total $45,000 Field Labor $25,000 Project Management + Reporting $30,000 Overall $100,000 Item #4


Download ppt "Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4."

Similar presentations


Ads by Google