Download presentation
Presentation is loading. Please wait.
Published byNoah McCormick Modified over 11 years ago
1
78th IETF CCAMP WG1 CCAMP Working Group Status Chairs: Lou Berger Deborah Brungard
2
78th IETF CCAMP WG2 WG Process - Reminder Chairs/Secretary moving to IETF tools (Trac) site for WG process management Supplemental information (including list of Communications and Liaisons) moved to wiki: –http://trac.tools.ietf.org/wg/ccamp/trac/wikihttp://trac.tools.ietf.org/wg/ccamp/trac/wiki Document status being tracked via Trac ticket system –Starting when document enters last call (so far) –http://trac.tools.ietf.org/wg/ccamp/trac/report/3http://trac.tools.ietf.org/wg/ccamp/trac/report/3 –Authors will be assigned as owners when there are open actions Communications and Liaisons also being tracked via tickets –Just incoming for now Open process (think wikipedia) –Any one can read –Logged-in users can modify wiki and tickets –Suggest new wiki content be coordinated with chairs/secretary or via WG mail list This will become required if open modify policy is abused
3
78th IETF CCAMP WG3 Document Status WG document status is always available at http://tools.ietf.org/wg/ccamp/http://tools.ietf.org/wg/ccamp/ Process reminder: WG WG LC Chairs IESG/ADs IETF LC RFC Editor RFC
4
78th IETF CCAMP WG4 Document Status – RFCs Recent RFCs: –None since last IETF In RFC Editors Queue: –draft-ietf-ccamp-ethernet-traffic-parametersdraft-ietf-ccamp-ethernet-traffic-parameters –draft-ietf-ccamp-gmpls-dcsc-channel-extdraft-ietf-ccamp-gmpls-dcsc-channel-ext –draft-ietf-ccamp-gmpls-ether-svcsdraft-ietf-ccamp-gmpls-ether-svcs –draft-ietf-ccamp-gmpls-mef-unidraft-ietf-ccamp-gmpls-mef-uni –draft-ietf-ccamp-gmpls-mln-extensionsdraft-ietf-ccamp-gmpls-mln-extensions
5
78th IETF CCAMP WG5 Document Status – IESG Processing draft-ietf-ccamp-gmpls-ethernet-pbb-te –Waiting on update from Authors draft-ietf-ccamp-lsp-hierarchy-bis –With AD
6
78th IETF CCAMP WG6 Document Status – Post WG Last Call draft-ietf-ccamp-gmpls-vcat-lcas –Waiting on chairs for Proto write-up draft-ietf-ccamp-rwa-wson-framework –Waiting on chairs for Proto write-up draft-ietf-ccamp-gmpls-ted-mib –Waiting for update post Expert Review No change from last meeting Update expected within a few weeks –Will need another LC (joint with MPLS) draft-ietf-ccamp-mpls-tp-cp-framework –Completed joint LC with PWE3 and MPLS –Liaison received from ITU-T –Presented in joint MPLS-TP session
7
78th IETF CCAMP WG7 WG Drafts Not on Agenda draft-ietf-ccamp-dpm –Companion document to RFC 5814RFC 5814 –Please send comments to the list draft-ietf-ccamp-gmpls-g-694-lambda-labels Updated, Ready for LC draft-ietf-ccamp-oam-configuration-fwk –no changes since last IETF draft-ietf-ccamp-rsvp-te-eth-oam-ext –updated draft-ietf-ccamp-rsvp-te-sdh-otn-oam-ext –no changes since last IETF
8
78th IETF CCAMP WG8 WG Drafts on the Agenda On the agenda –draft-ietf-ccamp-rwa-info –draft-ietf-ccamp-rwa-wson-encode –draft-ietf-ccamp-general-constraint-encode –draft-ietf-ccamp-wson-signal-compatibility-ospf –draft-ietf-ccamp-wson-impairments –draft-ietf-ccamp-gmpls-g709-framework –draft-ietf-ccamp-rsvp-te-mpls-tp-oam-ext
9
78th IETF CCAMP WG9 Communications Sent/Received ITU-T SG-15 –Received four Liaisons from Junes meeting: Lambda Switch Capable Equipment Response on G.709 efforts in IETF OTNT standardization work plan Approval process initiated for G.7714.1 revision OIF –Letter regarding Interface Identifier Received and reply sent MEF and IEEE –Need to send informal communications on Ethernet documents Links: –Wiki:http://trac.tools.ietf.org/wg/ccamp/trac/wiki/CommsLiasonshttp://trac.tools.ietf.org/wg/ccamp/trac/wiki/CommsLiasons –Tickets:http://trac.tools.ietf.org/wg/ccamp/trac/report/3http://trac.tools.ietf.org/wg/ccamp/trac/report/3 Please review the incoming documents and comment on ccamp@ietf.org ccamp@ietf.org
10
78th IETF CCAMP WG10 MPLS-TP MPLS-TP work continues Joint work –MPLS WG –PWE3 WG –CCAMP WG –L2VPN WG –OPSA WG Joint meetings to discuss MPLS-TP –Appear as MPLS and, if needed, PWE3 on the agenda –Covers all I-Ds for all working groups
11
78th IETF CCAMP WG11 Future MPLS-TP Control Plane Work Expect new work based on TP-CP Framework –Draft identified open areas which will be addressed through normal WG process (already happening) –Includes RFC 5467 Asymmetric bandwidth bidirectional LSPs Published as experiment, Standards Track needed MPLS-TP –Expect a bis before the next IETF, will start as WG draft Reminder: Pick the right WG –CCAMP: LSP Control Plane –PWE3: PW Control plane –Future of RFC
12
78th IETF CCAMP WG12 Other Items G.709 discussion –Non-draft slot scheduled in the second session To help close on-list discussion –Informal discussion being organized by authors Recent Disclosures (http://www.ietf.org/ipr/) –Per http://tools.ietf.org/html/rfc3979http://tools.ietf.org/html/rfc3979 –RFC5852https://datatracker.ietf.org/ipr/1327/https://datatracker.ietf.org/ipr/1327/ –RFC5392https://datatracker.ietf.org/ipr/1329/ https://datatracker.ietf.org/ipr/1330/https://datatracker.ietf.org/ipr/1329/ https://datatracker.ietf.org/ipr/1330/ –RFC5316https://datatracker.ietf.org/ipr/1332/https://datatracker.ietf.org/ipr/1332/
13
78th IETF CCAMP WG13 Other Items (continued) Non-LSP RSVP in CCAMP –We have an example of a draft that covers control of LSPs (via RSVP-TE) and control of IP flows (via classic RSVP) Common mechanism triggered by Francois Le Faucheur now in draft-berger-ccamp-assoc-info-01 –Raised procedural question on how to proceed Some options: 1.Separate drafts, in one WG (LSP and non-LSP) 2.Separate drafts, LSPs in CCAMP WG 3.One draft, in one WG Some discussion at last IETF and off list Direction from AD: Option 3, as an experiment »Will poll list for WG document status of related drafts
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.