Container Freight Station 200327156 유재동 200527200 김정환 200527201 정철호 200327156 유재동 200527200 김정환 200527201 정철호
2
contentscontents Chapter 1 Analysis of CFS Chapter 2 Study about facility Chapter 3 Assumption of project Chapter 4 Conclusion Chapter 5 Direction of project
3
Analysis of CFS
4
Interview with Prof. ◆ Situation of CFS - On the whole, There is no layout about facility - Store unit per pallet on the bare ground - Need layout about systematic cargo on board ◆ Situation of CFS - On the whole, There is no layout about facility - Store unit per pallet on the bare ground - Need layout about systematic cargo on board ch.1 Analysis of CFS - Interview with Prof. ch.2 Study about facility ch.3 Assumption of project ch.4 Conclusion - Direction of layout - Storage rate Ch.5 Direction of project
5
Study about facility
6
Storage Facility ◆ Rack ◆ Rack 1.Racks of Different Size 2.Racks of Singleness Size 1.Racks of Different Size 2.Racks of Singleness Size ch.1 Analysis of CFS - Interview with Prof. ch.2 Study about facility ch.3 Assumption of project ch.4 Conclusion - Direction of layout - Storage rate Ch.5 Direction of project
7
Storage Facility ◆ Rack ◆ Rack 1. If Racks of Different Sizes are installed, - Easy of Installation - Inconvenience of searching freight 2. If Racks of Singleness Sizes of other sorts are installed, - Possibility of storage by freight size - Easy of searching freight 1. If Racks of Different Sizes are installed, - Easy of Installation - Inconvenience of searching freight 2. If Racks of Singleness Sizes of other sorts are installed, - Possibility of storage by freight size - Easy of searching freight ch.1 Analysis of CFS - Interview with Prof. ch.2 Study about facility ch.3 Assumption of project ch.4 Conclusion - Direction of layout - Storage rate Ch.5 Direction of project
8
Treatment of Pallet ◆ T11 Pallet Asian Standard Pallet in Korea, Japan…. (1,100 X 1,100 mm ) ◆ T11 Pallet Asian Standard Pallet in Korea, Japan…. (1,100 X 1,100 mm ) 2 2 ch.1 Analysis of CFS - Interview with Prof. ch.2 Study about facility ch.3 Assumption of project ch.4 Conclusion - Direction of layout - Storage rate Ch.5 Direction of project
9
Assumption of Project
10
Assumption 1. One-way (entrance->exit) 2. Store unit per T11 pallet 3. Transport by using forklift 4. Treat 3 freight sizes (Big & Normal & Small) 5. Aisle is constantly 3.5 meter 1. One-way (entrance->exit) 2. Store unit per T11 pallet 3. Transport by using forklift 4. Treat 3 freight sizes (Big & Normal & Small) 5. Aisle is constantly 3.5 meter ch.1 Analysis of CFS - Interview with Prof. ch.2 Study about facility ch.3 Assumption of project ch.4 Conclusion - Direction of layout - Storage rate Ch.5 Direction of project
11
Conclusion
12
Direction of layout about Rack w Width of double shelf L Length of a storage space m Number of storage space along a shelf n Number of double shelves a Width of aisle u longitudinal dimension of the warehouse v Cross dimension of the warehouse Horizontal line Vertical line ch.1 Analysis of CFS - Interview with Prof. ch.2 Study about facility ch.3 Assumption of project ch.4 Conclusion - Direction of layout - Storage rate Ch.5 Direction of project
13
Storage rate ◆ Condition of freight storage Storage space rate about freight Big : Normal : Small = 10 : 60 : 30 ◆ Condition of freight storage Storage space rate about freight Big : Normal : Small = 10 : 60 : 30 ◆ After racks are installed (40X25m ) u v w=2L L a 2 2 ch.1 Analysis of CFS - Interview with Prof. ch.2 Study about facility ch.3 Assumption of project ch.4 Conclusion - Direction of layout - Storage rate Ch.5 Direction of project
14
Direction of Project
15
Direction of project ◆ Calculation of present handling cost ◆ Count come in & go out about each sizes ◆ Consideration of material handling cost (moving a storage), annual cost ◆ Calculation of present handling cost ◆ Count come in & go out about each sizes ◆ Consideration of material handling cost (moving a storage), annual cost Comparison of Total Cost ch.1 Analysis of CFS - Interview with Prof. ch.2 Study about facility ch.3 Assumption of project ch.4 Conclusion - Direction of layout - Storage rate Ch.5 Direction of project