1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification.

Similar presentations


Presentation on theme: "1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification."— Presentation transcript:

1 1 MAC Project

2 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification

3 3 BASF Mexicana Master Plan NovOctSepAugJulJunMayAprFeb Mar 2011 EquipmentsInteriors Civil construction Dismantling & Reinforcement Elevator # 1 Carpet Elevators Illumination Civil construction Site security system Air conditioning (HVAC) IT Furniture's Fire Protection Reinforcement MAC Project Construction release Front (Glass/Windows) Engineering Cafeteria Electrical installation Phase 1 Phase 3 Phase 4 Phase 2 Elevator # 2 Dismantling Planning Project execution:  Starting date: Feb. 14 th  Completion date: Nov. 30 th  Building occupation: Dec. 16 th  19 Contractors bring support  More than 180 workers at site  Big opening: March 13th

4 4 BASF Headquarters major renovation  23 year old building; construction @ 80´s.  Voluntary participation: Rigorous LEED process  BASF Demonstrates Leadership, Design, Innovation and environmental stewardship.  Participate in the new way buildings are designed and operate; enabling an environmental and socially responsible, healthy and appropriate environment to improve the quality of life BASF Mexicana Sustainable Building

5 5 Advantages  Natural light throughout  Occupancy Increases (from 290 to 340 workstations)  Increase conference rooms (from 8 to 21)  Show room (BASF Products) & Branding throughout building  Technology; Wireless capabilities everywhere & ATM Machine  Special collaboration areas (casual Collision)  Water treatment plant implementation  Many BASF Products used in the construction. BASF Mexicana Sustainable Building

6 BASF Mexicana BASF Products at MAC EB, Masterseal I600®, Waterproof system in roofs. EB, Ucrete®, System for kitchen floor. EB, Sonolastic NP1™, Seal for glass and concrete. EB, Sonoshiel HL5000™, Impermeable sealant for green roof. EB, Thorolastic ™, Interiors & exteriors painting system. EB, Enviroseal™, Seal for concrete elements. EB, Cemento Tolteca® from CEMEX. EC, Water Borne Paint ¨Reflex Silver¨ for metal doors. EC, R-M system & Clear DC5600 / Solvent. ED / KT, Carpet SHAW with Nylon fibers BASF & Dispersions from Altamira. ED, Paint from COREV Customer with ED resins, Interiors. ED, FANDELI, sand paper with ED products. ED, Paint from COMEX Customer, exteriors and Interiors.

7 7 BASF Mexicana LEED First LEED certification in Latin America in restoration BASF MAC Offices LEED Certification Energy use 35% 20% 30% Water use CO2 Emissions 95% Recycling Annual Savings: 1.7 million lts water 250,000 kWh 476 tons CO2

8 8 BASF Mexicana BASF - Before

9 9 BASF Mexicana The New BASF Building

10 10 BASF Mexicana BASF - Before

11 11 BASF Mexicana BASF - Before

12 12


Download ppt "1 MAC Project. 2 BASF Mexicana Content 1 │Master Plan 2 │Budget 3 │New Sustainable Building 4 │BASF Materials 5 │LEED Certification."