Download presentation
Presentation is loading. Please wait.
Published byTerence Woods Modified over 9 years ago
1
AIRPORT 2009 Airport Forum BUCHAREST, October 28-th, 2009 Development & Modernization / Phase III
2
TECHNICAL DATA Operational capacity: 42 movements/hour Aircraft parking platforms: 2, with a total of 45 parking positions Runways: 08R – 26L: 3500 x 45 m; CAT IIIB 08L – 25R: 3500 x 45 m; CAT IIIA
3
TECHNICAL DATA Fire fighting and rescue: CAT 9 ICAO Terminals capacity: 4 500 000 passengers/year Peak hour processing capacity: international flights 1200 pax/flow domestic flights 270 pax/flow
6
INFRASTRUCTURE DEVELOPMENT Main objectives (1): Extension of Finger, including implementation of Schengen flows –16.600 sq.m., from 5 to 14 air-bridges and from 9 to 24 gates –11 new escalators, 11 new lifts, 3 mobile sidewalks –Nov 2010/Apr 2011 Extension of the International Departures Terminal (future Departures Terminal) –19.600 sq.m., 52 check-in desks –8 new gates for non-Schengen flights –July 2012 Phase III of the airport development and modernization
7
INFRASTRUCTURE DEVELOPMENT Main objectives (2): Reconfiguration of the International Arrivals Terminal and Domestic Terminal building into the new Arrivals Terminal –2 500 sq.m. –52 new check-in desks –January 2012 Car parkings –12 000 sq.m., 459 lots –October 2009 Other works and access roads –5.000 sq.m. Phase III of the airport development and modernization
8
INFRASTRUCTURE DEVELOPMENT Passengers terminals final capacity: Passengers total capacity: 4500 pax/peak hour 86 check-in desks, 24 boarding gates, 4 baggage belts (international / Schengen) 18 check-in desks, 8 boarding gates, 2 baggage belts (domestic / non-Schengen) Over 6.000.000 pax/year Phase III of the airport development and modernization
9
Phase III of the airport development and modernization project INFRASTRUCTURE DEVELOPMENT
10
Phase III of the airport development and modernization project
11
INFRASTRUCTURE DEVELOPMENT Phase III of the airport development and modernization project
12
BUCHAREST HENRI COANDĂ INTERNATIONAL AIRPORT
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.