Presentation is loading. Please wait.

Presentation is loading. Please wait.

Clearwater Subbasin Planning or The Long and Winding Road Clearwater Focus Program Idaho Soil Conservation Commission.

Similar presentations


Presentation on theme: "Clearwater Subbasin Planning or The Long and Winding Road Clearwater Focus Program Idaho Soil Conservation Commission."— Presentation transcript:

1 Clearwater Subbasin Planning or The Long and Winding Road Clearwater Focus Program Idaho Soil Conservation Commission

2 Clearwater Subbasin in the Basin

3 Clearwater Focus Program Origin and Structure Authorized by the 1994 NW Power and Conservation Councils Columbia Basin Fish and Wildlife Program, funded by the Bonneville Power Administration. Program is co-coordinated by : Idaho Soil Conservation Commission Nez Perce Tribal Watershed Division

4 Purpose of the Clearwater Focus Program Coordinate watershed projects to protect, enhance, and restore habitat impacted by the Columbia River hydroelectric system.Coordinate watershed projects to protect, enhance, and restore habitat impacted by the Columbia River hydroelectric system. Facilitate optimal use of funding sources and subbasin expertise.

5 Land Cover Types

6 Western Clearwater Subbasin

7 Eastern Clearwater Subbasin

8 Ownership and Management

9 ESA Listed Fish Species in the Subbasin Fall Chinook, to Lolo Creek West Coast Steelhead Bull Trout

10 ESA Listed Animal Species in the Subbasin Gray Wolf American Peregrine Falcon Bald Eagle Grizzly Bear

11 ESA Listed Plant Species Spaldings Catchfly Macfarlanes Four OClock Water Howellia Ute Ladies Tresses

12 Habitat Project Areas

13 SCC Coordination Objectives The Road Were On Subbasin Assessment Subbasin Management Plan & Inventory Implementation Project Support

14 Policy Advisory Committee People on the Highway Idaho Association of Counties/Idaho County Idaho State: IDEQIDFGIDL Nez Perce Tribe Executive Committee Soil and Water Conservation Districts Clearwater and Nez Perce National Forests NOAA Fisheries U.S. Fish and Wildlife Service Potlatch Corporation

15 The Funding Trail Rockin Down the Highway CBFWA MMG endorsed contract modifications March 2000 Council approved contract modifications April 5, 2000 Bonneville contracts September 2000

16 Add Provincial Review Along the Road March 2001 Draft Subbasin Summary May 2001 Final Subbasin Summary August 2001 Aquatic Assessment August 2001 Provincial Review October 2001 Terrestrial Assessment

17 Planning Phase Hit the Road Again PAC began the planning process in January 2002 after Provincial Review activities were complete. The Technical Guide for Subbasin Planners was available for this phase. Guidelines were not mandatory.

18 The Vision Transcendental Highway PAC developed a vision statement and 9 guiding principles for planning The vision for the Clearwater Subbasin is a healthy ecosystem with abundant, productive, and diverse aquatic and terrestrial species, which will support sustainable resource-based activities

19 Plan Completed Dancing on the Highway The Final Draft Clearwater Subbasin Plan was presented to the Northwest Power and Conservation Council in Coeur dAlene on November 14, 2002

20 The First ISRP Junction Pavement Cracks The ISRPs 43-page review of the draft Clearwater Subbasin Plan was available February 19, 2003 – Some of the points: Plan is not complete enough to be consistent with the Councils Program In current form does not constitute a viable subbasin plan

21 More at the First ISRP Junction Breakdown Lane Strategies are not fully and clearly defined nor are they prioritized Linkages (internal consistency) between assessment/management plan/inventory are not explicitly described Aquatic and Terrestrial resources need to be described more quantitatively.

22 More at the First ISRP Junction Wreck on the Highway Other than these the ISRP loved the draft Clearwater Subbasin Plan Actually, the ISRPs evaluation inspired additional subbasin plan review criteria be adopted to the Councils program

23 Contingency Planning Crawling from the Wreckage Clearwater PAC decided to respond to ISRP comments and requested the Council not start the adoption process The logic path went something like: Gee with so many comments, certainly we can improve the plan

24 Amending and Rewriting On the Road Again Response fix-it loop began July 2003 Prioritized and selected subset of ISRP deficiencies to address Clearwater Subbasin Plan formally submitted for adoption process November 19, 2003

25 The Second ISRP Junction Sideways Down The Highway The ISRPs 25-page review of the Clearwater Subbasin Plan was available February 6, 2004 – Some points: There were fewer pages because the ISRP referred to their previous review often While an improvement over the 2002 draft, it does not differ substantively from that draft …………

26 Adoptability Framework Bright Side of the Road Councils central staff developed a framework for adoptability and used it to evaluate the Clearwater Subbasin Plan Framework based on Councils program language and the Power Act; later used to review other subbasin plans

27 Where is the Clearwater Plan Today Side of the Road Clearwater Planners responded to central staff Adoptability Framework review Clearwater Subbasin Plan was categorized as between the Green Group and the Blue Group in basin plan review process Await next phase of process

28 Production of Clearwater Plan Hillbilly Highway 34 PAC Meetings 24 Subcommittee Work Sessions 5 NOAA Specific Meetings 11 Public meetings 23 Drafted Component Releases 8 Drafted Whole Plan Releases 114 Individuals Participated in Process

29 Issues that Popped Up Malfunction Junction(s) Assessment & Summary Production Models for data synthesis Subbasin Planning vs Recovery Planning Public participation Additional program language review criteria & new adoptability criteria ISRP – Twice

30 Whats Next in the Clearwater Further up the Road Implementation projects continue as ongoing until plan adoption and call for new projects – the system to be designed Continue to pursue project funds from multiple sources Continue subbasin plan implementation via other processes and funding

31 What a Long Strange Trip it has Been Questions and/or Comments

32 Potential Management Units Groups of 6 th Field HUCs, contiguous or not, clustered to characterize areas with similar themes that may influence restoration or recovery planning. Individual project planning will require site specific information. There are 22 PMUs delineated in the Clearwater.

33 Attributes Delineating PMUs Species (4) - Distribution, Life History, Hatchery Influence, Exotic species Landscape Level (4) - Ownership Accessibility, Protection, Land Use Habitat (5) – Habitat & H2O Quality, Limiting Factors, Temperature, Hydrology Disturbances (10) – Roads, Mines, Sediment, Surface Erosion, Landslide, Etc

34 Distribution and Relative Status of Steelhead in the Subbasin Layer

35 Road Density GIS Layer

36 Surface Erosion Hazard Layer

37 §303(d) Listed Streams

38 Landslide Hazard Layer

39 Potential Management Units

40 Watershed Scale

41 Big Canyon Creek Disturbances Potential Management Unit 6 –Surface Erosion Hazards – Very High –Landslide Hazard – Moderate to High –Road Densities – Moderate to High Potential Management Unit 7 & 8 –Surface Erosion Hazards – Very High –Road Densities – Moderate to High

42 Big Canyon Watershed & PMUs Limiting Factors –Temperature –Base Flow –Sediment –Watershed Disturbance –Habitat Degradation Restoration Issues –Temperature –Sediment –Prairie Grasslands –Ponderosa Pine


Download ppt "Clearwater Subbasin Planning or The Long and Winding Road Clearwater Focus Program Idaho Soil Conservation Commission."

Similar presentations


Ads by Google