Electric Energy Resources Chris Nelson Commissioner SD Public Utilities Commission October 2012
2
The SD Public Utilities Commission The Commissioners Chris Nelson – Chairman Kristie Fiegen – Vice Chairman Gary Hanson – Commissioner Staggered, six-year terms. Staff of analysts, attorneys, consumer representatives and other professionals work with the Commissioners to carry out the duties of the PUC.
3
Utility Regulation Ensure safe, reliable service at fair and reasonable rates. Regulate investor-owned electric, natural gas and telephone utilities. Limited regulatory role: wireless communication companies and cooperative, independent and municipal utilities.
4
Electricity in South Dakota Average Residential Electric Rates per kWh SD: 9.35 ¢ US: 11.4 ¢ Brookings October through June: 7.0 ¢ July through September: 8.0 ¢ Rural SD 9.55 ¢
5
Demand and Energy Energy = kWh Demand = kW
6
ElectricityDemand Electricity Demand
7
Member Load Peaking Surplus Sales Surplus Sales Time Load Combined Cycle Base Load Generation Base Load Generation Electric Load vs. Generation
8
Wind Energy Benefits Sustainable Environmentally-friendly Economic Development Limitations Cost Subsidy Intermittency Generation profile vs. load needs Lack of (cost-effective) storage mechanism
9
Inside a Wind Turbine
10
Wind Potential SD ranks in the top 5 states
12
Total Bus Bar Costs in Cents/kWh 11.1 9.7 7.7 12.8 6.3 Wind Turbine Combined Cycle
13
Existing Coal Plants (2010)
14
Crow Lake Project Cost $308 Million Basin Electric $124 Basin Electric $124 Tax Recovery $92 Tax Recovery $92 Grant $92
15
9200 MW Capacity (92 million light bulbs) First 40 days of 2011 2900 MW Generated – 32% February 28 5500 to 1500 in 12 hours Forecast 6000 – Actual 4400 Difference is equal to Oahe, Big Bend, Fort Randall Shut off 16 million light bulbs?? Wind Variability - MISO Area
16
Wind Generation April 2010 Crow Lake
17
Generation Profile vs. Load Profile
18
Recent Development Tatanka Wind Project – 88.5MW McPherson County Wessington Springs Wind Project – 51MW Jerauld County Buffalo Ridge I – 50.4MW Brookings County Titan Wind Project – 25MW Hand County Day County Wind Farm – 99MW Day County Buffalo Ridge II – 210MW Brookings and Deuel Counties PrairieWinds SD1 – 165MW Jeruald, Aurora and Brule Counties
19
Successful Wind Development 3 Ingredients for Success: An excellent wind resource Transmission A buyer for the electricity
21
Hydroelectric Power Advantages Minimum pollution Low operations and maintenance costs Reliable and proven over time Renewable Disadvantages High investment costs Can impact the environment and natural habitats Large area of land needed, change in elevation Reliability on rainfall - variable
22
Hydroelectric Dam
24
Hydroelectric Power in SD 55% of Electric Generation is Hydro Oahe Dam (1962) – 786 MW Big Bend Dam (1966) – 493 MW Fort Randall Dam (1956) – 320 MW Gavins Point Dam (1957) – 132 MW
25
New Hydro Missouri River Energy Services Red Rock Reservoir, Pella, Iowa 36 MW up to 55 MW
26
Hydroelectric and Wind Interaction Hydro can regulate wind Hydro can shut down wind 2011 Story Missouri River Dams average annual production – 10,000 GWh May 1, 2011 forecast – 14,000 GWh September 30, 2011 forecast – 11,800 GWh 18% above average
27
Solar Power Advantages Renewable No pollution “Fuel” is free Disadvantages Initial Costs Amount of sunlight is not constant Current Issues Technologies and materials are changing and getting cheaper Competition from China Solyndra
29
Source: EIA Renewable Electric Power Plants
30
Nuclear Power 20% of electricity generated in US Most widely used fuel is uranium Advantages Large amount of energy produced, No emissions Disadvantages Safety concerns, waste storage, fuel limited, permits Nuclear Power Plants Serving SD Xcel Energy 3 Nuclear Power Plants in MN Fukushima, Japan Virginia Earthquake
31
Source: NRC Nuclear Power Plants
32
Energy Resources Used in SD
33
Energy Resources Generated in SD
34
Recent Siting Dockets CapEx 2020 Power Line White, SD to Twin Cities Future Siting Dockets White, SD to Big Stone Big Stone to Ellendale, ND
35
Which Resource is Best? Best Solution: A Mix of Generation Resources
36
Energy Efficiency How can we Save Energy? No Cost Ways Low-Costs Ways Investments
37
Thanks for your Questions! www.puc.sd.gov