Download presentation
Presentation is loading. Please wait.
Published byGrace Simpson Modified over 10 years ago
1
A Virtual Survey
2
Steps Make sure you print out the field note page and fill it out using proper technique. Survey Info –This is a profile leveling on the Smith Farm –Weather is warm 75 degrees and sunny –Use todays date –C. Jones is the rod person, –You are the instrument person –Use appropriate profile note arrangement
3
Survey course BM1 Large stone on East edge of field near the culvert 0+00 3+50 0+50 3+00 2+502+001+001+50 4+00 TP1 TP2 Old Mill Road 50 feet
4
Backsight to BM1
5
Foresight to 0+00
6
Foresight to 0+50
7
Foresight to 1+00
8
Foresight to 1+50
9
Foresight to 2+00
10
Backsight to TP1 (2+00)
11
Foresight to 2+50
12
Foresight to 3+00
13
Foresight to 3+50
14
Foresight to 4+00
15
Foresight to 4+50
16
Foresight to 5+00
17
Backsight to 5+00
18
Foresight to TP2
19
Backsight to TP2
20
Foresight to BM1 Cant figure out the number of feet in the reading? Look closely at the small red numbers.
21
Finish the notes The survey is complete. Calculate the allowable error using the formula in your book. The distance measured is 1,100 feet. Indicate if the survey is acceptable For the diagram, copy the page in this presentation
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.