Download presentation
Presentation is loading. Please wait.
Published byFelicia Holt Modified over 9 years ago
1
SAP R/3 Budget
2
SAP R/3 Costs Hardware Software Add-on software and hardware Implementation process Training of operators Maintaining the system Opportunity costs of system failure System upgrade
3
Cost of Hardware Basic workstation Dell Dimension 2400 Series: $618 per unit (Bulk sales negotiated) Quality and Development Server Dell PowerEdge 1600SC: $6,862 per unit Production Server PowerEdge1600SC: $10,799 per unit
4
Cost of SAP R/3 Software SAP cost fluctuates; approx. $1.5 million. Cost includes client-side and server-side software, backup software, operating system, test and development tools. Modules can be customized; selected modules are pertinent to business functions
5
SAP Modules NECESSARY Financial Accounting Human Resources- Personnel Admin. Materials Management Sales and Distribution FOR IN-HOUSE PRODUCTION Production Planning Quality Management General Logistics Plant Management
6
Cost of Add-On Software and Hardware SOFTWARE Backup executive file for Windows servers Veritas ver. 9.0: $300-500 Backup Storage Area Network Option BrightStor ARCserve ver. 9: $1000- 1600 HARDWARE Storage controller Adaptec SCSI RAID 2100s: $388-445 each Interface Converter IBM SAN Data Gateway Router 2108 Model R03: $6000 Networking Cable Belkin Pro Series: $40 per 100 ft. Router D-Link DI-604: $60 Barcode Scanner Wasp WLP 4170: $250-300.
7
Cost of Implementation
8
Cost of Training of Operators
9
Cost of Maintaining the System ANNUAL COST Cost determined by but not restricted to the follow factors: Customer Support Replacement materials Debugging and anti-virus software Maintenance costs included on budget also comprise of wages for support personnel (cost obtained by number of employees times average yearly salary) 20 employees @ $75,000 annually= $1,500,000
10
Lost Opportunity Costs Gauging cost is difficult and sometimes inaccurate. Solution: set money aside (amount still to be negotiated with size of R/3 system) for possible system failure Scenarios to consider: General Ledger application crashes Infrastructure collapses Productivity services become unavailble
11
Periodical System Upgrade The typical upgrade for SAP would be approx. $3.1 million. This number can decrease, however, with the number of modules on the company’s system. The ImageFX Upgrade cost, based upon the number of end users and modules, should approximate to about $600,000.
12
Final Budget Cost of Hardware$23,841 Cost of SAP Software≈ $1,500,000 Cost of Add-Ons≈ $12,452 Cost of Implementation≈ $119,060 Cost of Training $145,000 Cost of Maintenance≈ $1,600,000 Lost Opportunity CostsTBA Cost of Upgrade≈ $600,000 GRAND TOTAL$4,000,353
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.