Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada 24-25 May 2004 DLR Report Martin Pilgram,

Similar presentations


Presentation on theme: "Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada 24-25 May 2004 DLR Report Martin Pilgram,"— Presentation transcript:

1 Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada 24-25 May 2004 DLR Report Martin Pilgram, DLR

2 CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, 24-25 May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/2004 2 DLR participation DLR-GSOC continued its work within the reporting period in the following working areas: RF & Modulation (SLS Area) Navigation (MOIMS Area) Data Transfer Service (CSS Area) Service Management (CSS Area) Spacecraft Monitor and Control (MOIMS Area) Security (System Engineering Area)

3 CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, 24-25 May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/2004 3 Working Groups (1) RF & Modulation M. Häusler will replace W. Schwarz. - H. Hofmann represents DLR in the Spacecraft M&C WG starting with Montreal meeting - Montreal Meeting was reported as very informative and constructive for a „Beginner“ - DLR supports the shifting of the delivery of the WB 1.0 to the next meeting for improving the content of this book. Spacecraft Monitor and Control Discussion in DLR to support the Mission Planning activities within this WG. Today the priority is very low (6 and 7 out of 10).

4 CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, 24-25 May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/2004 4 Working Groups (2) Navigation R. Kiehling participated in the current WG meeting. DLR appreciates the progress of the WG: Significant progress was done on: - ODM (Orbit Data Message), -TDM (Tracking Data Message), and -ADM (Attitude Data Message) recommendations. ODM prepared to go blue. XML will be added end of the year. Prototype software implemented at DLR/GSOC for OPM generation. Test with ESOC completed within May, 2004. DLR/GSOC will contribute to improve the present versions, especially of the TDM. After completion of the ODM, TDM will be the next. This corresponds with DLR interests. DLR/GSOC will organize an intermediate meeting to work on the TDM during the Flight Dynamics Conference in Munich (mid October).

5 CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, 24-25 May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/2004 5 Working Groups (3) Security M.Pilgram participates the first day in the WG. The following items are discussed: - Threat document: Consensus on updating the classes. -Architecture document based on open standards, designed to be expandable and allows for fault management -CCSDS standards for areas as encryption, authentication, integrity and key management discussion started -Creation of an outline of a security section for CCSDS documents Question on how to interchange on sec aspects with other WGs -Time overlap -Limited resources

6 CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, 24-25 May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/2004 6 Working Groups (4) Security (2) The current WG meeting was a step in the right direction. This includes the creation of CCSDS security standards as well as delivering support on security for other WGs. At the end this should help to overcome the high borders on security, which all the time occurs on setting up cross support between the agencies. DLR will support this work on security issues within the given WG. Unfortunately the contribution of resources by agencies outside Europe during the meeting was very limited. Hopefully this could be improved in the future.

7 CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, 24-25 May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/2004 7 Working Groups (5) Transfer Data Services (1) M. Pilgram was the DLR-GSOC representative in this WG. Update of the Books according the following reasons: - clarifications necessary brought up by the ongoing implementation in ESA - updating to the new TM/TC terminology -check of ASN.1 delivered with the books - consolidation of the books (keep the books as close as possible) - RAF Pink Book 911.1-P1.1 (DLR) - FCLUT Pink Book 912.1-P1.1 (DLR) - RCF Red Book 911.2-R-2 (DLR) - FSP Red Book 912.3-R-2 (ESA) -ROCF Red Book 911.5-R-1 (ESA)

8 CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, 24-25 May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/2004 8 Working Groups (6) Transfer Data Services (2) DLR also supports the decisions in the CSS area: But: be aware of overlaps between the Service taken Management WG with Spacecraft M&C WG. - General Cross Support Service as toolbox - First items of the Toolbox are RAD and Tracking - No new WG, update the Transfer Data Service WG - Stop the development of a combined Return Book -API documentation - Standardize Proxy definition - Publish the ESA SLE API books as Best Practices -Pink Sheets to the reference model submitted to the secretary -Publishing of Service Management Red Books on the next meeting

9 CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, 24-25 May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/2004 9 GSOC CCSDS related items Missions at DLR: The following table shall give a brief overview on the present and planned missions: ProjectLaunch DateUplink ComplianceDownlink ComplianceData Archive CHAMPin orbitfull compliant archiving of TF‘s GRACEin orbitfull compliant archiving of TF‘s BIRDin orbitno CCSDS standardfull compliantarchiving of TF‘s EUTELSAT W-series and HOT- Bird in orbitfull compliantpartial compliantno archiving of TF’s TERRASAR-X2006full compliant t.b.d. SARLUPE2005-2007full compliant t.b.d.

10 CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, 24-25 May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/2004 10 GSOC SLE Implementation The current implementation of SLE – Services is done in GSOC for the upcoming missions TerraSAR-X: - SLE in the Central Checkout System - SLE based Ground Network SARLupe -SLE I/F to EGSE -SLE User I/F to the MCS -SLE based Ground Network and in the area of the ESOC/GSOC Cooperation. SLE service user and provider tests for RAF, RCF and CLTU will start this summer. Integral via Weilheim and a DLR satellite via Madrid.

11 CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, 24-25 May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/2004 11 General issues - The level of the documentation and the actualization of the content is very much depending on the WGs. DLR proposes to generate procedures how to use the DocuShare by the WGs. - Hopefully the support of the secretary will come up again after the change of the supporting contractor. It would be helpful fort he future to be informed about organizational problems as well. - Till today DLR didn’t see a big change of the CCSDS work after the change of the structure. The old problems on getting enough resources for the defined work are still ongoing. - As DLR is involved in work items which soon be finished there is an interest to know, how these items are handled after closing down a WG.


Download ppt "Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada 24-25 May 2004 DLR Report Martin Pilgram,"

Similar presentations


Ads by Google