Presentation is loading. Please wait.

Presentation is loading. Please wait.

Contractor EHS Performance Data January, 2014. Site Contractors w/o Gulfstream 0.24 Freeport Site w/o Gulfstream 0.18 Site Contractors with Gulfstream.

Similar presentations


Presentation on theme: "Contractor EHS Performance Data January, 2014. Site Contractors w/o Gulfstream 0.24 Freeport Site w/o Gulfstream 0.18 Site Contractors with Gulfstream."— Presentation transcript:

1 Contractor EHS Performance Data January, 2014

2 Site Contractors w/o Gulfstream 0.24 Freeport Site w/o Gulfstream 0.18 Site Contractors with Gulfstream 0.28 2013 OSHAs Dow 4 Contractor 14 Gulfstream 5 2013 OSHA Rates Contractor 11.6 MM hours (new record!) w/Gulfstream 13.5 MM hours 2013 Man hrs.

3 19 Injuries (Including Gulfstream) 9 Slips/trips/ falls 7 Line of fire 5 Hand injuries 2 Other body part 2 Chemical exposures 1 Ergo injury 2013 Recordable Injury Summary

4 2013 Site Performance Against Goals 2013 Goal2013 Actual% vs goal I/I Rate0.18 100% Severity Rate0.580.35140% Count19 100% LOPC4637120% PSIs21150% Agency Reportable18 100% DOW RESTRICTED

5 2013 Site Performance Against Dow Global Rates Dow GlobalTexas Operations% Better / (Worse) I/I Rate0.200.1810% Severity Rate0.750.3553% DOW RESTRICTED

6 Against 2011 Baseline for “One Site; One Team; Zero Injuries” Journey 20112013% Better / (worse) I/I Rate0.450.1860% Severity Rate1.740.3580% I/I Count421955% DAWC Count13192% LOPCs563734% PSIs4175% Agency Reportable1518(20%) DOW RESTRICTED

7 Includes Gulfstream

8

9 544 Incidents in 2013 vs 554 Incidents in 2012

10

11

12 How are you keeping your folks focused on the task? Effective tailgates Field observations Interventions Detailed JEPs and STACs Are your folks following what they have written on their STACs and JEPs?

13

14

15 autopilot inattention behavior

16

17

18 Common observations between contractors and MEC… STAC, PPE, housekeeping

19 Over 1000 unacceptable PPE observations

20 Did your PPE Performance improve from last month? Companies in red had unacceptable PPE observations in December.

21

22

23

24

25 1 Hand injury in Dec.

26

27

28

29

30

31

32

33 Thanks for a solid year!! Let’s have an outstanding year in 2014 Review the trends Identify opportunities for your companies Set goals to improve

34 REMINDERS  JANUARY EMPHASIS & STAC INSERT The STAC card Special Emphasis for January is to write in the special emphasis section of the card: “ I will work safe today and not injure myself or my co-workers!”  NEXT SAFETY CONTACT MEETING 2/13/14


Download ppt "Contractor EHS Performance Data January, 2014. Site Contractors w/o Gulfstream 0.24 Freeport Site w/o Gulfstream 0.18 Site Contractors with Gulfstream."

Similar presentations


Ads by Google