1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006
2
2 Pre-beam commissioning (I) October 3: cooldown starts on Dec. 1 st and that we will not see collisions before Jan. 1 st, 2007. Present situation: cooldown starts on Jan 2 nd and we will not see collisions before Feb. 1 st. Pre-beam commissioning status: done in progress to be done the two detectors installed all cables (signal, HV and LV) connected Gas recirculation system operational Gas monitoring system – Bob/Craig UV lamp monitoring -- Sasha/Tom/Craig readout electronics operational & take data in stand-alone mode – Chi HV software fully operational – Deepali/Takao
3
3 Pre-beam commissioning (II) noise optimized dead channel count pedestal runs done routinely timing and data taking with pulser done routinely data taking with UV-lamp – Sasha/Tom/Craig ADC charge calibration for all detector modules first order zero suppression -- Maxim Monte Carlo simulations basic Geometry and materials in reconstruction up to the pad response 3d map in +- configuration cluster reconstruction tracking to HBD
4
4 Pre-beam commissioning (III) HBD online monitoring, including: Event display: pad response Event display: cluster response Pulse height distribution of a detector modules Pad frequency vs. pad number Cluster size distribution Cluster pulse distribution Tracking in the +- field 3d field map Very good progress over the last two months in spite of QM and we still have about 2 months to complete this program. I think it is doable in this amount of time.