22/11/2007GIE Annual Conference 2007- Madrid1 26/04/2007GLE1 Investment in LNG Different approaches in EU FRANCISCO DE LA FLOR - GLE PRESIDENT
2
22/11/2007GIE Annual Conference 2007- Madrid2 26/04/2007GLE2 LNG Increasing Demand SOURCE: TOTAL
3
22/11/2007GIE Annual Conference 2007- Madrid3 26/04/2007GLE3 Existing LNG Terminals LNG Terminals under construction / committed LNG Terminals planned/under study LNG Infrastructures in the World 2007 Existing Liquefaction Terminals Liquefaction Terminals under construction/planned/under study (58) (35-40) (70-80) (21) (40-50) SOURCE: PETROLEUM ECONOMIST & LNG JOURNAL
4
22/11/2007GIE Annual Conference 2007- Madrid4 26/04/2007GLE4 SOURCE: NATURAL GAS MARKET REVIEW 2007, IEA 600 400 200 0 bcm 60-100 bcm 80-160 bcm Regional Production LNG Imports Pipeline Imports LNG Increasing Demand in OCDE Countries 2005 20102015
5
22/11/2007GIE Annual Conference 2007- Madrid5 26/04/2007GLE5 15 Existing LNG Terminals 8 LNG Terminals under construction/ commmitted 23 LNG Terminals under study/planned -LNG plays different roles in each EU country. -LNG regulation differs in each MS depending on national needs and particularities. LNG Terminals in Europe
6
22/11/2007GIE Annual Conference 2007- Madrid6 26/04/2007GLE6 Different Approaches: SPAIN (1) Barcelona - ENAGAS SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 6 540.000 1.700.000 Tenerife - GASCAN SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 1 150.000 Gijón - ENAGAS SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 2 300.000 800.000 Gran Canaria-GASCAN SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 1 150.000 COMMITTED/ UNDER CONSTRUCTION Sagunto - SAGGAS SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 2 300.000 800.000 Cartagena- ENAGAS SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 3 290.000 1.200.000 Huelva- ENAGAS SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 4 470.000 1.200.000 Ferrol - REGANOSA SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 2 300.000 412.000 Bilbao - BBG SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 3 300.000 1.200.000 EXISTING UNDER STUDY/PLANNED UNDER EXPANSION PROCESS Demand Growth (PowerGen + Backing-up Renewables) Full r-TPA without exemptions Government’s Infrastructure Mandatory Planning LNG terminals considered Basic Infrastructures as Pipelines and UGSs.
7
22/11/2007GIE Annual Conference 2007- Madrid7 26/04/2007GLE7 Spanish LNG Infrastructures to 2011 Regasification Capacity Number of tanks Storage Capacity
8
22/11/2007GIE Annual Conference 2007- Madrid8 26/04/2007GLE8 Different Approaches: UNITED KINGDOM AngleseyCanvey Island STORAGE (m 3 LNG) Isle of Grain - NGC SEND-OUT (m 3 /h) Nº TANKS 4 200.000 708.000 EXISTING UNDER STUDY/PLANNED UNDER EXPANSION PROCESS COMMITTED/ UNDER CONSTRUCTION SouthHook – SOUTHOOK LNG SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 2.400.000 775.000 5 Dragon – DRAGON LNG SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 1.050.000 3 504.000 Cover Increasing Dependency on gas imports Allow Supply Diversification All terminals exempted
9
22/11/2007GIE Annual Conference 2007- Madrid9 26/04/2007GLE9 DIFFERENT APPROACHES: ITALY Panigaglia - SRG SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 2 100.000 439.000 Adriatic – ADRIATIC LNG SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 1.000.000 2 250.000 Brindisi SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 1.300.000 4 640.000 Toscana Offshore Rosignano Porto Empedocie Taranto San FerdinandoGioia TauroPrioloTriesteZaule EXISTING UNDER STUDY/PLANNED UNDER EXPANSION PROCESS COMMITTED/ UNDER CONSTRUCTION Cover Increasing Dependency New terminals almost completely exempted (80%) Many projects announced, only few in progress
10
22/11/2007GIE Annual Conference 2007- Madrid10 26/04/2007GLE10 DIFFERENT APROACHES: FRANCE Montoir - GdF SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 3 360.000 1.380.400 Fos Tonkin - GdF SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 3 150.000 Le Verdon Le Havre Fos-sur-Mer Fos Cavaou – STMFC SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 1.160.000 3 330.000 Dunkerque Le Verdon EXISTING UNDER STUDY/PLANNED UNDER EXPANSION PROCESS COMMITTED/ UNDER CONSTRUCTION Supply diversification r-TPA for existing terminals New terminals exempted/regulated ?
11
22/11/2007GIE Annual Conference 2007- Madrid11 26/04/2007GLE11 DIFFERENT APROACHES: BELGIUM Zeebrugge – FLUXYS LNG SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 3 261.000 750.000 EXISTING UNDER STUDY/PLANNED UNDER EXPANSION PROCESS COMMITTED/ UNDER CONSTRUCTION Strategic Geographic situation (Zeebrugge Hub) Transition to multi-shipper environment r-TPA with long term contracts
12
22/11/2007GIE Annual Conference 2007- Madrid12 26/04/2007GLE12 Other Approaches: PORTUGAL AND GREECE Revithoussa - DESFA SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 2 130.000 240.000 Sines – REN ATLANTICO SEND-OUT (m 3 /h) Nº TANKS STORAGE (m 3 LNG) 2 240.000 900.000 EXISTING UNDER STUDY/PLANNED UNDER EXPANSION PROCESS COMMITTED/ UNDER CONSTRUCTION Security and diversification of Supply Regulated terminals r-TPA
13
22/11/2007GIE Annual Conference 2007- Madrid13 26/04/2007GLE13 Other Approaches (II): WILHELMSHAFEN GERMANY POLAND SWINOUJSCIE THE NETHERLANDS GATE TERMINAL EEMSHAVEN LIONGAS CROATIA OMISALJ CYPRUS VASSILIKO EXISTING UNDER STUDY/PLANNED UNDER EXPANSION PROCESS COMMITTED/ UNDER CONSTRUCTION Supply diversification. Exempted terminals with long-term contracts. Long permits/authorisations/exemptions phase.
14
22/11/2007GIE Annual Conference 2007- Madrid14 26/04/2007GLE14 EU FUTURE LNG INVESTMENTS 2007-2012 0 2 4 6 8 10 12 14 Existing (Expansion) Committed/ Under construction Planned/ Under study bn € SOURCE: GLE MAP & ROUGH INTERNAL ASSESSMENT Significant Investments ongoing Allowing Supply Diversification Increasing Gas Supply competition Long-term Commitment (regulatory and/or contractual)
15
22/11/2007GIE Annual Conference 2007- Madrid15 26/04/2007GLE15 THANK YOU FOR YOUR KIND ATTENTION!