NewExt Structure of the final report 1.Executive Summary 2.Introduction 3.Monetary Valuation of mortality risks 4.Valuation of impacts based on the standard-price approach 5.Multi-media impact pathways 6.Assessment of major accidents 7.Revision of external cost estimates 8.Conclusions
2
NewExt Work Package 6: Revision of External Cost Estimates IER (5.2 PM), ARMINES (2 PM), VITO (1.5 PM), PSI (1 PM) Draft Structure
3
NewExt Time plan until the end of the project End of May:Cost statements Annual report Mid of June:All inputs for WP 6 available End of June:Official end of NewExt WP 2/3/4/5 reports End of August:Final report ready Technology Implementation Plan Final Cost Statements Final Meeting (Brussels?)
4
NewExt Key technologies that have been analysed before within the ExternE project: Coal fired power plant Oil fired power plant Combined-cycle plant using natural gas Photovoltaic plant Wind turbine How do new methodologies affect external cost estimates? Work Package 6: Revision of External Cost Estimates
5
NewExt DIEM workshop / GreenSense ? Work Package 6: Revision of External Cost Estimates Status ExternE National Implementation Status before / without NewExt Status including NewExt Changes due to new values applied according to WP 2/3/4/5 Changes due to parameter, DRF, and database updates etc.
6
NewExt Changes by new methods of assessment? Monetary Values of mortality Valuation of impacts based on standard-price New multi-media impact pathways (real EcoSense extensions) Major accidents Calculations within / without EcoSense ? (in the frame of this project) Work Package 6: Revision of External Cost Estimates
7
NewExt
11
Comments and conclusions: