Download presentation
Presentation is loading. Please wait.
Published byHelena Lamb Modified over 9 years ago
1
POTENTIAL DISASTERS AS A RESULT OF CLIMATE CHANGE - AND HOW TO PREVENT THEM Jan Coppes FIDIC, 4-8 September, Beijing
2
Witteveen+Bos 2 1. types and causes of disasters 2. relationship climate change and flooding 3. research programme CLIMATE CHANGES SPATIAL PLANNING 4. new concepts for flood mitigation 5. development plan MORE SPACE FOR THE RIVER contents
3
Witteveen+Bos 3 types causes situation in the Netherlands disasters
4
Witteveen+Bos 4
5
5 climate change higher temperature causes larger discharge
6
Witteveen+Bos 6 relationship climate change and flooding 1. increase in discharge 2. more extremes 3. large consequences for land and water use
7
Witteveen+Bos 7 climate changes spatial planning from sectoral to integrated approach research consortium government research institutes private sector NGO’s
8
Witteveen+Bos 8 research objectives 1. creation of knowledge infrastructure on interface of climate change and spatial planning 2. dialogue between stakeholders to develop innovative spatial planning that anticipates climate change and contributes to a safe and sustainable infrastructure
9
Witteveen+Bos 9 research programme themes 1. climate scenario’s 2. mitigation 3. adaption 4. integration
10
Witteveen+Bos 10 research programme details 2004 - 2009 EUR 100 million cooperation with other European programmes, such as CLOUDNET, PRUDENCE, DAEDALUS, CARBOEUROPE, GMES, VISage, etc.
11
Witteveen+Bos 11 new concepts for flood mitigation 1. receding of primary dikes 2. creation of more river branches 3. creation of river overflows and retention basins 4. lowering of groynes
12
Witteveen+Bos 12 new concepts for flood mitigation 5. deepening of river beds 6. removal of summer dikes 7. reduction of discharge to river 8. removal of obstacles 9. lowering of river forelands
13
Witteveen+Bos 13 lowering of groynes
14
Witteveen+Bos 14 deepening of river bed
15
Witteveen+Bos 15 removal of summer dikes
16
Witteveen+Bos 16 reduction of discharge to the river
17
Witteveen+Bos 17 removal of obstacles
18
Witteveen+Bos 18 lowering of river forelands
19
Witteveen+Bos 19 development plan ‘more space for the river’ budget: EUR 2.2 billion construction period: 2007 - 2015
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.