Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR 19.09.2014.

Similar presentations


Presentation on theme: "Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR 19.09.2014."— Presentation transcript:

1 Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR 19.09.2014

2 Objective AOM21 ESSIP Plan 20142 Comprehensive Explanation What is new or has changed since LSSIP 2013 Link to European ATM Master Plan Finalisation Criteria and Closed Questions ESSIP Report 2013 Objective Coordinator’s Analysis, recommendations, tips & tricks Links and contacts

3 ESSIP Plan 20143 Comprehensive Explanation  Area of applicability: All ECAC States except Armenia, Azerbaijan, Georgia  Initial Operational Capability (IOC): 09/2013 Full Operational Capability (FOC): 12/2017  The objective will ensure the progressive deployment of free route airspace.  It covers the Interim Deployment Programme part of the free route implementation  Aligned with the European Route Network Improvement Plan (ERNIP) Part 1

4 What is new or has changed since LSSIP 2013 ESSIP Plan 20144  No changes

5 Link to European ATM Master Plan ESSIP Plan 20145 Objective AOM21 covers the following SESAR OI steps:  OI step - [AOM-0401] - Multiple Route Options & Airspace Organisation Scenarios  OI step - [AOM-0402] - Further Improvements to Route Network and Airspace incl. Cross-Border Sectorisation and Further Routeing Options

6 Most important SLoA(s) ESSIP Plan 20146  AOM21-ASP02 - Implement system improvements (finalisation date 12/2017).  AOM20-ASP03 – Implement procedures and processed in support of the local dimension (finalisation date 12/2017).  Each SLoA should be fulfilled in accordance with the relevant provisions of the European Route Network Improvement Plan (ERNIP) Part 1

7 Finalisation Criteria and Closed Questions ESSIP Plan 20147 Finalisation criteria:  Contact your subject matter expert to determine the deployment Status for each SloA Closed questions:  Closed Questions have been introduced for this Objective  Statements on Deployment Status should provide answers to Closed Questions

8 ESSIP Report 2013 ESSIP Plan 20148 Implementation of FRA seems to progress in accordance with agreed timeframe 6 States report this Objective as Completed and 2 as Partially Completed None of the States reports this Objective as Late at this stage Remaining States report this objective as Planned

9 Objective Coordinator’s Analysis, recommendations, tips & tricks ESSIP Plan 20149  Ensure that your subject matter expert is involvement once you make your statement.  Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material.  Attention to the applicability to the Military stakeholders as airspace users (pilots and flight planning).  To ensure appropriate progress on this Objective, full coordination shall take place through the ERND function of the Network Manager.

10 Links and contacts ESSIP Plan 201410 Objective Coordinator: Agnieszka DYBOWSKA +32 2 729 5152 agnieszka.dybowska@eurocontrol.int NMD Objective Expert: RazvanBUCUROIU +32 2 729 3648 razvan.bucuroiu@eurocontrol.int