Download presentation
Presentation is loading. Please wait.
Published byApril Wade Modified over 9 years ago
1
Online Consent Management & Monitoring System (OCMMS) for State Pollution Control Boards By NIC, New Delhi
2
Enhance transparency in the existing processing of application. Reduce the processing time of application and related paper work System will overall improve the functioning and performance of the SPCB Citizen Centric Objective
3
Application Features A highly interactive menu driven, user friendly customized package for non specialist end users at local level Online Industry Registration Online Submission of Application, Approval, Clarification and other activities for CTE/CTO for all category of Industries/Institutions Online Scheme Monitoring and Evaluation System User management at all level, reviewers and approvals Online Workflow Management Decision Support System – Guidelines, Alert/Notifications, Issues and Risk Management Reports / Query Download Facility – Forms, Documents etc. Multi level Security Enabled System Role based application access State Specific Customization
4
Modules/Sub-Systems Consent Management -Consent To Establish for Red, Orange & Green Industries Including; Mines, Bio-medical Institutions/ Hospitals for Small, Medium and Large size industries. -Consent To Operate for Red, Orange & Green Industries Including; Mines, Bio-medical Institutions/ Hospitals for Small, Medium and Large size industries. Waste Management System (BMW, HWM, MSW) CESS Administration System Laboratory Management System Monitoring & Evaluation System Delivery System -Information, Alert and Notification through eMail etc. Advisory System – Bulletin Board, News etc. Report/Queries Frequently Asked Questions (FAQ)
5
Process Diagram - Workflow Management
6
Technology Stack Open Source Technology Stack -Apache/Tomcat 5.5 -Jdk 1.5 -PostGRE SQL8.2
7
Data Requirement -Organization Structure -List of Tehsil: District wise -Roles & Activities: Admin and other roles -Legacy Industry Data Configuration -Create Workflow -Create Profile and Roles -Assign Activity and Forwarding Rights -GO LIVE Application Rollout Requirement
8
OCMMS Home Page
41
Capacity Building SPCB1 SPCB2 SPCB3 SPCBn Change Request (CR) done by SPCBs in the basic application Central project Management team at NIC- HQ Documentation of the CR Setup CPM Team at NIC- HQ Development/ Customization on the basis of changes required by SPCBs Deployment of customized OCMMS at SPCB Server 2 Asst. Programmers to be deployed at SPCB HQ Training Provide to the SPCBs staff at State HQ Training to the trainer in order to train people at regional level Implementation Process
42
Financial Estimation (per state) SNoDescriptionCost (in Rs.) 1Hardware Cost ( 260000) 1.1 1 Desktop35000 1.2 1 UPS5000 1.3 1 Scanner + Printer + Fax20000 1.4 Server200000 2Network Connectivity Infrastructure Cost ( 275000) 2.1 At SPCB office, minimum 2 Mbps, Router, Layer 2 Switch - Leaseline200000 2.2 At RO/Do level, minimum 512Kbps - Broadband75000 3OCMMS Customization Cost ( 655250) 3.1 1 Team Leader five man months @46000/- per man month 230000 3.2 1 Sr. Developer for five months @ 33000/- per month 165000 3.3 2 Programmers for five months @26025/- per man-month 260250 4Implementation & Training Cost per SPCB(636000) 4.1 4.2 2 Assistant Programmers at SPCB HQ for 1 year @16000/- per month 1 Assistant Programmer at each RO office for 1 year @16000/- per month 384000 192000/- 4.2 Travel Cost60000 Total 1826250
43
Thanks
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.