The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.

Similar presentations


Presentation on theme: "The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing."— Presentation transcript:

1 The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing can take place

2 Walls marked for switch positions

3 Walls marked for plugs and BT

4 Walls marked for oil burner connections

5 Framing for stud walls

6 Getting ready for first fix plumbing

7 Initial stage of waste fixings

8 Drilling the wall for waste outlet

9 The soil pipe in position with other service ducts

10 Cutting access holes for pipes

11 Almost ready for a radiator

12 Fitting neatly in the corner

13 A start to plumbing first fix

14 More plumbing fixings

15 More of a plumbers work

16 Walls tracked ready for electrical first fix

17 Conduit and wiring in place

18 First fix electrical finished

19 Where all the wiring ends for now