Download presentation
Presentation is loading. Please wait.
Published byDustin Gibson Modified over 9 years ago
1
Climate Change and the Planning Process Michael Jenkins Principal Sustainable Development Officer
2
Background n Starting to Act Differently n Sustainability Forum
3
Climate Change Declaration n Developed by WAG and WLGA n Mitigation & Adaptation n Adopted by the Council 12th October 2005
4
Adaptation to Climate Change n What does this mean for Council Services? n E.g Highway Maintenance n Planning Process (Climate Neutral Development Scheme)
5
Climate Neutral Development Scheme n Checklist n Good Practice Notes
6
Checklist n Transport n Site Layout n Building Design n Energy n Water n Sustainable Drainage Systems n Materials
7
Example n Is the rainwater drained from hard surfaces within the proposed development provided by SuDS? n Is roof rainwater drainage systems provided by SuDS rather than mains drainage?
8
Good Practice Notes n Infiltration Devices: e.g. soakaways n Preventative Measures: Water Butts, Storage Tanks n Permeable & Porous Surfaces
9
Conclusion n Climate Neutral Development will greatly assist proposed developments within the County Borough to be climate change proof.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.