TOT on Environmentally Sound Design and Implementation of PWs Community Roads of the PSNP June 13 – 23, 2011 Dessie, Ethiopia By Dessalegn Bezabih Roles of Supervisors, DAs, Woreda Road Desk Officers in PSNP LBRC
2
1.Role of the Supervisor in LBRC: Monitor the planning and design of road project (route selection, surveying, setting out, etc.) Monitor quality of construction as per design (earthwork, drainage system, drainage structures,, Prepare payment certificates and Certify or approve payments on behalf of owner Roles of Supervisors, DAs, Woreda Road Desk Officers in PSNP LBRC
3
Environment Friendly PSNP Roads: Roles (Cont’d) 2. Roles of Development Agents: Plan road work in detail as part of CBPWDP (when to do it and how to do it: Action plan), Plan the required manpower, Mobilize community or manpower, Organize work force, Guide the actual construction work on site, and Report the work done periodically.
4
Environment Friendly PSNP Roads: Roles (Cont’d) 3. Roles of Woreda Road Desk or Office: Train Development Agents on rural road planning and construction, Facilitate/participate in planning of rural roads like alighnment selection, surveying, setting out, Supervise rural road construction and assist DAs
5
Environment Friendly PSNP Roads: Roles (Cont’d) 4. Roles of Road Sector Government Institutions: ERA: Ethiopian Roads Authority – staff training, standardization and technical support RRAs: Regional Road Authorities – training, supervision and technical support
6
Environment Friendly PSNP Roads: Roles (Cont’d) 5. Roles of Different Programs ERTTP - Ethiopian Rural Travel and Transport Program, a pilot integrated program, phased out PSNP - Productive Safety Nets Program of FSP (SARDP) - Sida-Amhara Rural Development Program, phased out, Nontheless, Valuable experience achieved Capacity built at all levels: region, zone, woreda and community Local staff trained on LBRC, esp. Diploma in S/Wollo
7
Video Show ILO Video
8
Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works- Community Roads of the Productive Safety Net Program (PSNP) June 13-24, 2011 Ghion Ambassel Hotel Dessé, Ethiopia