Download presentation
Presentation is loading. Please wait.
Published byNorma Benson Modified over 9 years ago
2
Long Term Ecological Research Network Information System LTER Grid Pilot Study LTER Information Manager’s Meeting Montreal, Canada 4-7 August 2005 Mark Servilla (LNO)
3
Pilot Study Goals Demonstrate the vision of the LTER Grid to the LTER community Demonstrate how grid and middleware technologies can be applied to enhance collaboration and sharing within and external to the LTER community Demonstrate an effective working relationship with the LTER Network office, NCSA, ISI, and GRIDS Center staff Demonstrate the potential of super computers for LTER science Collect requirements for a detailed design of the LTER Grid
4
Strategies Contrived scientific experiment Short duration (6-month) end milestone Demonstration of final product Directly involve stake-holders Identify key and usable Grid infrastructure
5
LTER Grid Pilot Study LTER Network Office –University of New Mexico NCSA –University of Illinois at Urbana-Champaign ISI –University of Southern California KBS LTER (Dr. Stuart Gage) –Michigan State University SEEK –NCEAS at the University of California, Santa Barbara
6
LTER Requirements LTER Portal/Single Sign-on Security –Authentication –Access Control Audit Logging –Data Access Intellectual Rights Protection Data Use Policy –Resource Access High Performance Computing Resources Data Storage Resources Collaboration Tools
7
Pilot Study Experiment “Acoustic Pattern Matching” Environmental Acoustic Monitoring –Embedded microphone –Sampling every 30 minutes for 30 seconds –Conversion to *.wav file format
8
Pilot Study Experiment “Acoustic Pattern Matching” Ornithologic (bird) pattern matching –DSP/Matlab workbench –Match unknown dataset to an known signature
9
User Scenario User logs onto portal (single sign-on) Selects known signature file(s) Performs data search via Metacat for unknown acoustic file(s) Performs acoustic matching on HPC; match probability identified to user
10
Architectural Components Web application - noname (J2EE using struts and jglobus) Certificate Management – MyProxy/LDAP (now being used by TeraGrid) Data Transfer - GridFTP Job Management - GRAM (pre-WS) GSI Authentication – Metacat GT4 Container Metadata Database - Metacat 1.5 modified for GSI (Java servlet) Data Discovery - Metacat Query Inteface (Java servlet using struts framework) DSP Analysis - Matlab
11
Infrastructure Scenario 1.Portal accepts user credentials and passes to MyProxy 2.MyProxy validates thru LDAP and issues certificate back to Portal 3.Portal accepts acoustic signature selection by user 4.Portal accepts acoustic query; passes query and certificate to GT4/Metacat; request logged 5.Metacat returns query results to Portal; return logged 6.Portal accepts selection of unknowns by user; passes certificate and data transfer request to data POP and HPC 7.POP and HPC accepts certificate; POP, via GridFTP, transfers data to HPC 8.HPC performs matching; returns results back to Portal 2 1 3 4 5 6 7 8
12
Current Status March 2005 –Generate detailed work-flow and application(s) specified –Generate detailed project plan –Identify components, services, and APIs –Identify roles and responsibilities –Generate detailed architecture –Identify site, personnel, and data involved –Team meeting at NCSA April 2005 –System and User Environment configuration –Software/hardware development and integration June 2005 –Software/hardware development and integration July 2005 –Release of functioning prototype –Prototype testing and evaluation –Site deployment of software/hardware –Site integration of software/hardware –Site testing and evaluation August 2005 –Release of working system –System testing and evaluation –Preparation of demonstration September 2005 –Demonstration
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.