PREPARATION OF PERSPECTIVE PLAN FOR
AMRITSAR-KOLKATA INDUSTRIAL CORRIDOR (AKIC) REGION A brief presentation on West Bengal BY DELHI MUMBAI INDUSTRIAL CORRIDOR DEVELOPMENT CORPORATION (DMICDC)
2
The Sequence
3
The Sequence The Exercise The Corridor AKIC Profile & Delineation Selection of smart industrial cities / Integrated Manufacturing Clusters (IMCs) Way Forward
4
The Exercise
5
The Exercise Preparation of Regional Perspective Plan for AKIC Region, and strategy for transforming the region into a globally competitive manufacturing and investment destination through sustainable development Conduct of Feasibility Study and Concept Master Planning for 1 Integrated Manufacturing Cluster (IMC) in each AKIC State in consultation with respective State Government Analysis of benefits of development of AKIC including impact on regional growth, employment, industrial output, exports and human capital
6
The Corridor
7
The Corridor AKIC Region PUNJAB UTTARAKHAND HARYANA UTTAR PRADESH
BIHAR WEST BENGAL JHARKHAND
8
AKIC profile & delineation
9
AKIC profile & delineation
Work in progress Gathering and updating of data, documents, policies etc from AKIC states State profiling & analysis on relevant sectors/ key parameters GIS based analysis, assessment & mapping of AKIC region for suitability/ influence area Work in progress!
10
Selection of IMC
11
Land area of minimum 10 sq km (1000 Ha/ 2471 acres)
Selection of IMC Broad Parameters for IMC Identification [TOR] Land area of minimum 10 sq km (1000 Ha/ 2471 acres) Growth Potential of the Area Water & Power Availability Connectivity & Logistics Greenfield / Brownfield Maximization of land areas under Govt. ownership, barren/waste/un-irrigated lands
12
Proximity to EDFC (Eastern Dedicated Freight Corridor)
Selection of IMC Parameters for District Ranking [level 1 analysis] Urban Centers – Ranked under Number of Urban centers and their population in a district Land Availability – Ranked based on availability of barren/waste/un-irrigated lands Transport – Ranked on the ease of accessibility and networking of Roads, Rail, Air, Waterways along with logistic centers and connectivity to ports Proximity to EDFC (Eastern Dedicated Freight Corridor) Infrastructure – Ranked on basis of safe ground water blocks Industrial Performance – Ranked according to current land parcels under industrial establishments DATA being compiled – Govt. Land Availability in each District Industrial Performance in terms of Employment, Output & Investment District-wise
13
2 1 3 Selection of IMC Zones Identified –
3 prominent zones [level 1 analysis] Zones Identified – North 24 Parganas District Barddhman and Bankura Districts South 24 Parganas and East Medinipur 2 1 3
14
Selection of IMC Location of alternative sites
Panagarh Industrial Park, in Barddhaman district, Raghunathpur in Purulia district, Goaltore, Paschimi Medinipur, Vidyasagar Industrial Park, near Kharagpur in Paschimi Medinipur
15
Location: NH-2, Panagarh Plots Un-allotted 30%
Selection of IMC Site 1: Panagarh Industrial Park, Barddhaman Area of the Park: 1458 Acre Location: NH-2, Panagarh Plots Un-allotted 30%
16
Selection of IMC Site 1: Panagarh Industrial Park, Barddhaman Potential of setting up IMC here lies in Expansion of the Industrial Park by approximately 1000 Acre. Comprehensive External and Internal Infrastructure Development in Existing Park and Expansion Zone under IMC
17
Raghunathpur II site is 734 Acre
Selection of IMC Site 2: Raghunathpur, Purulia Location of Raghunathpur II Site on SH-5 connecting Asansol and Raghunathpur Raghunathpur II site is 734 Acre
18
Selection of IMC Site 2: Raghunathpur, Purulia Raghunathpur 2 Site, 734 Acre, owned by WBIDC is recommended for Setting up IMC External and Internal Infrastructure can be planned comprehensively for Raghunathpur 2 and Raghunathpur Site (1897 Acre) as these two Site are located in proximity on SH-5. Raghunathpur I (684 Acre) where almost 100% land is allotted and Raghunathpur Site around 30% land is un-allotted
19
Plans of Raghunathpur Site, Raghunathpur I, and Raghunathpur 2.
Selection of IMC Site 2: Raghunathpur, Purulia Plans of Raghunathpur Site, Raghunathpur I, and Raghunathpur 2. Pink color land/sites are not yet allotted in Raghunathpur and Raghunathpur I Sites All sites belongs to WBIDC/GoWB
20
Location of Goaltore Site is on Medinipur-Goaltore-Garhbeta Road
Selection of IMC Site 3: Goaltore, Paschimi Medinipur Location of Goaltore Site is on Medinipur-Goaltore-Garhbeta Road It is located around 26 Km from Chandrakona Road Station.
21
Location of Goaltore Site is on Medinipur-Goaltore-Garhbeta Road
Selection of IMC Site 3: Goaltore, Paschimi Medinipur Location of Goaltore Site is on Medinipur-Goaltore-Garhbeta Road It is located around 26 Km from Chandrakona Road Station.
22
Plan of the Goaltore Site
Selection of IMC Site 3: Goaltore, Paschimi Medinipur Area of the Site : 950 Acre Location: Goaltore Site: Greenfield Plan of the Goaltore Site
23
Main Railway Junction and Airport at Kharagpur
Selection of IMC Site 4: Vidaysagar Industrial Park, Paschimi Medinipur Location of Vidyasagar Industrial Park, is on junction of NH-6 and NH-60 near Kharagpur Main Railway Junction and Airport at Kharagpur Brownfield Site where expansion of Acre is possible
24
Plots Un-allotted 500 Acre
Selection of IMC Site 4: Vidaysagar Industrial Park, Paschimi Medinipur Area of the Park: 1150 Acre Location: NH-6 and NH-60 Kharagpur Plots Un-allotted 500 Acre
25
Potential Expansion Zone on East site of Vidyasgar Industrial Park
Selection of IMC Site 4: Vidaysagar Industrial Park, Paschimi Medinipur Potential Expansion Zone on East site of Vidyasgar Industrial Park Acre Expansion potential to set up an IMC here
26
Way Forward
27
Way Forward Facilitation, coordination & support on data/ information gathering by NODAL officer/ agency [land resource/ government lands, land use/ land cover, industry, natural resources, socio-economic, transport infrastructure, water resources, power/ energy, education, health, housing including affordable housing, environment etc] – soft/ hard copies Revenue maps & details of select locations/ Government lands for IMC location – soft/ hard copies Next steps on the project by consultant Timely approval of reports (at various stages) by the state/s.