Presentation is loading. Please wait.

Presentation is loading. Please wait.

AEB 6184 – Simulation and Estimation of the Primal Elluminate - 6.

Similar presentations


Presentation on theme: "AEB 6184 – Simulation and Estimation of the Primal Elluminate - 6."— Presentation transcript:

1 AEB 6184 – Simulation and Estimation of the Primal Elluminate - 6

2 Cobb-Douglas Parameters

3 Fuel Use (Field Operations)Fertilizer Dry Spread0.15Nitrogen91.80 Disk-Chisel1.70Phosphorous36.58 Field Cultivate0.70Potash23.50 Planting0.40 Spraying0.10 Combine1.45 Total Diesel4.50 Diesel Price2.64 Total Fuel11.88Total Fertilizer151.88 Field Data for Corn

4 Total Costs and RevenuesParameters Total Fuel11.88α0.0195 Total Fertilizer151.88β0.2500 Total Labor33.06γ0.0544 Total Variable Cost196.82Diesel (gal.)4.50 Corn Yield135.0Fertilizer (tons)0.4116 Corn Price4.50Labor (hours)4.15 Total Revenue607.50 Profit per Acre410.68 Revenues

5 Prices 20072008 Corn Price (FL)4.004.50 Corn Price (GA)4.504.60 Fertilizer Price367614 Fuel Price (Diesel)2.6393.393 Labor Price7.978.91

6 Cobb-Douglas Function

7  We need to think about three four prices  Corn Price  Diesel Price  Fertilizer Price  Labor Price  We could assume normality  How to choose Ω?  Possible negative prices? Drawing Prices

8  We could choose a uniform distribution.  For our purpose here, let’s assume that the standard deviation is 1/3 of the value of each price.  In addition, let’s assume that the input prices have a correlation coefficient of 0.35 and the output price is uncorrelated.  The variance matrix then becomes

9  In the univariate form, given a mean of  and a standard deviation of  we would create the random sample by drawing a z from a standard normal distribution  In the multivariate world, we use the Cholesky decomposition of the variance matrix and use the vector of the means Drawing Random Samples

10 CornFuelFertilizerLabor 4.0317966-7.1139459207.2647413.085498 6.28399293.7932016376.3440315.001602 7.42396973.1434042371.200998.1599310 4.552542311.179552505.757597.6772579 4.37305283.9382136370.574377.5128182 5.6384301-9.1074158153.624406.2727747 1.64777215.5279925445.250537.2384782 1.828461810.856964522.646697.9042016 2.52325672.0854507351.8415512.358072 Price Draws

11 Production Levels

12 FuelFertilizerLaborOutput 4.77812600.617424543.3704676147.90853 7.83053550.850135128.4152978170.02817 0.92299980.261570663.7495936116.23514 2.85929250.389572124.1813763132.05003 0.44626930.071033870.950783376.77729 0.24323530.064778720.932054874.06527 2.38792630.181459251.1241763101.21032 5.25334490.3158794013.261536135.01835 Input Demands and Output Levels

13  First stage estimation – Ordinary Least Squares  Second stage – System Ordinary Least Squares using the first-order conditions.  From the first-order conditions Estimation

14  Each of the observations in the system can then be expressed as Estimation (Continued)

15  Imposing the cross equation restrictions Estimation (Continued)

16  First estimation (without heteroscedasticity) Estimation (Continued)

17  With heteroscedasticity Estimation (Continued)

18 Parameter123True Alpha 02.19262.18372.18342.1804 Alpha 10.00690.01940.01930.0195 Alpha 20.25870.25030.24990.2500 Alpha 30.05190.05110.05410.0544 Kappa 10.38270.4233 Kappa 2-0.00030.0003 Results


Download ppt "AEB 6184 – Simulation and Estimation of the Primal Elluminate - 6."

Similar presentations


Ads by Google