Presentation is loading. Please wait.

Presentation is loading. Please wait.

Releasing the potential of housing modification design through Building Information Modelling Rachel Russell MSc Occupational Therapist and PhD Candidate.

Similar presentations


Presentation on theme: "Releasing the potential of housing modification design through Building Information Modelling Rachel Russell MSc Occupational Therapist and PhD Candidate."— Presentation transcript:

1 Releasing the potential of housing modification design through Building Information Modelling Rachel Russell MSc Occupational Therapist and PhD Candidate

2 Do you relate to any of the following…

3 Building Information Modelling (BIM) the new Buzz word Government is the single largest customer of the construction industry (40% of £110 billion) 20% saving Sustainability agenda (Carbon etc) PERFORMANCE (not just form and function) BIM to be used on all major public financed building by 2016

4 What is Building Information Modelling (BIM) BIM is a set of interacting policies, processes and technologies producing a methodology to mange the essential building and project data in digital format through the building life cycle” Coates, Arayici et al (2010)

5 Benefits of BIM Improved collaboration through visualisation Improved building performance by analysing the model Improved communication through the flow of information across the different stages of: -Design -Construction -Facilities Management Therefore you reduce waste…

6 This got me thinking… In Theory OT’s play an important role in the design and delivery of housing modifications…why? We use our knowledge to get the right fit between Person, Environment AND… Graphical representation of person environment fit Carnemolla & Bridges (2011) based on Pope & Brandt (1997)

7 Psychological and emotional stressors Social support within the environment Habits and roles Design of the environment Demands of the Occupation Personal characteristics influencing the capacity of the individual to interact efficiently with the environment (Mackenzie 2011) …and OCCUPATION To support occupational Performance in the design process we consider…

8 Process Model for Designing Housing Modification (Bridges 2006, Reich 1991) Problem Sensing Problem Validation IntegrationPrioritisation Evaluation

9 This got me thinking… Research indicates – We need to explore fully our client requirements during the design process (Fange & Iwarrson 2005) – We tend to focus on a narrow definitions of Person, Environment fit parameters ( Hocking 1999 and Heywood 2004) – We lack the ability to effectively analyse how our recommendations will perform and support occupational performance (Palmon 2004, Bridges 2006) – We lack the ability to compare different modification design solutions, which is an essential part of the design process (Palmon 2004, Bridges 2006) – We should use 3D CAD analysis tools when planning and evaluating housing modifications (Eriksson 1996) – We fail to adopt a collaborative approach. When we do collaborate the individual finds it confusing (Nord et al 2009)

10 Benefits of BIM for Housing Modification Delivery/Design Process Improve collaboration through visualisation - 3D walk through - Use of artefacts Improve occupational performance by analysing the model -Behaviour simulation -Pre-occupancy evaluation -Verification of design intent Improve communication with the user and other professional s through the flow of information across the different stages of: -Design -Construction -Facilities Management -All information remains in the model -Specifications -2D CAD drawings -Cost analysis -Understand the clinical reasoning process -Training -Supervision

11 Are you all ready doing it? -Design in 2D -Free text to capture problems/needs -Visual simulation -Access to guidance documents -Access to product information -Communication with other professionals -Specifications

12 What next… Phase 1 – Survey to understand the process – Case study for in-depth information Phase 2 – Expert focus group to develop a BIM “prototype” with “Process” Phase 3 – Case study to try it out!!!!!

13 …What next Participate in the Survey Spread the word of the survey Offer case studies Be an expert Trial site

14 To Conclude Does BIM have the potential to improve the design of housing modifications through supporting the OT design process? In the field of housing modifications we need to demonstrate what we do is “clinically” and cost effective Technology can be used to enhance what we do well (PEO fit) A housing modification is an invasive procedure – do your present processes support informed consent…?

15 Thank you

16 References Heywood, F. (2004). "Understanding needs: a starting point for quality." Housing Studies 19(5): 709-726. Nord, C., P. Eakin, et al. (2009). "An exploration of communication between clients and professionals in the design of home adaptations." The British Journal of Occupational Therapy 72(5): 197-204. Palmon, O., R. Oxman, et al. (2004). Virtual environments as an aid to the design and evaluation of home and work settings for people with physical disabilities. Fänge, A. and S. Iwarsson (2005). "Changes in accessibility and usability in housing: An exploration of the housing adaptation process." Occupational Therapy International 12(1): 44-59. Eriksson, J., G. I. Johansson, et al. (1995). "A planning tool prototype for environment adaptations." Rehabilitation Engineering, IEEE Transactions on 3(3): 283-287. Bridges, C., P. Phibbs, et al. (2007). Identifying Barriers to Home Modifications. Sydney, Austrialia, The University of Sydney.


Download ppt "Releasing the potential of housing modification design through Building Information Modelling Rachel Russell MSc Occupational Therapist and PhD Candidate."

Similar presentations


Ads by Google