Download presentation
Presentation is loading. Please wait.
Published byJustin Riley Modified over 9 years ago
1
Briefing on the Embarcadero Thank you Realtors for joining us
2
OBJECTIVES Milestones Recent Accomplishments Future Projects Recognition Photos Challenges Upgrades
3
Milestones we have reached: Completed a Full Audit – No Problems Completed Reserve Study – Adopted to fully fund Reserve Program (Common Areas, RLC & Marina) on track and on budget
4
Recent Accomplishments Sealing the envelope through roof and deck work – addressing all dry rot found Last condo roof “I” building completed 2010 RLC Roof scheduled for this fall Gutter program for completed decks and new siding Remodel Fireside Room Upgrade Restaurant Upgrade gift store Landscaping Upgrades
5
Future Projects Rebuild marina Reduce sediment entering our marina Achieve land lease cost reduction goals Major energy savings programs Continuation of deck replacement program
6
Deck Schedule (Decks, Doors, Windows, Thresholds, Shingles…) Decks Completed 2008/2009 35 Decks scheduled 201043 Decks scheduled 201143 Decks Scheduled 201243 Decks scheduled 201343 Decks scheduled 201446 Total decks to be completed 253
7
Chamber Recognition Leading to Increased restaurant traffic And increased room occupancy rate
8
Now, here are some photos of what we have done so far…
9
Roofs Scheduled 2010 “I” Building RLC Bldg. Roofs Scheduled 2010 “I” Building RLC Bldg.
10
Dry Rot found during deck work
11
Completed Decks Wood Vinyl
12
Beam Replacement
13
New Building Gutters
14
C Building Improvements Before & After
16
Directional Signs
17
Fireside Room Now Updated
18
Restaurant has a new look
19
Gift Shop Modifications
20
Objectives E E E Energy Conservation $48,355 less rebate $25,948 = $22,407 Vapor Barrier Wrapped Pipes Under-floor insulation Water-saving shower heads (w/rebate)
21
2010 Reserve Fund Projects Boardwalk Repairs$ 22,500 Dry Rot decks/doors/windows$474,300* Fireside/Restaurant Carpet$ 18,250 “I” Building Roof & Skylights$ 65,925* Deck and Roof Gutters$ 9,610* “F” Building Support Beams$ 45,000 HVAC (heating, venting, air conditioning) $ 84,000 RLC Roof Replacement$151,745 Marina Lockers/Floats by Charter Area $ 76,200* Whaler Wood “C” Dock$ 50,000 Electrical Upgrade “E” dock$ 30,000 *continuing projects
22
~It’s all about the view~
23
We would love your feedback Comments/Impressions Please Questions? This presentation can be found on our website: www.embarcaderouoa.com under “Realtor Corner” www.embarcaderouoa.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.