Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New resident room lighting, Resident room door replacement, Patio reconstruction, & ADA compliant hardware. Before June 2, 2008 Demolition in progress. June 30,2008 Patio construction in progress.
2
LOBBY BEFORE… Elevator shaft cut in at lobby. (Former mailbox location). June 30, 2008 LOBBY NOW…June 2 – June 30 Lobby and front desk receive massive demolition to prepare for location of new elevator, mailboxes, front desk reconfigure & more... HD Office demo continues. June 30, 2008 Front Desk Demo. June 2, 2008 Lobby demo. June 2, 2008Lobby & HD Office demo. June 2, 2008
3
And the basement sees action too! FITNESS ROOM walls come down to make way for elevator shaft. COMPUTER LAB NOW… COMPUTER LAB BEFORE… STUDY LOUNGE BEFORE… STUDY LOUNGE NOW… June 2, 2008
4
Resident Rooms In Progress… Sprinkler system & heater placement in progress. June 2 - 30, 2008 Skimcoating of block walls on 4W begins. What a change! Painting of walls, door frames, new wood door install, casework, windows and new lights to follow. June 30, 2008 Arrival of New Windows! June 30, 2008
5
Resident floor corridors in progress… 4W corridor shows skimcoating in progress. Painting of walls, door frames and install of new wood doors to follow. June 30, 2008 View of cut-in elevator shaft & access panel from 4 th floor. (Former 440 resident room.) June 30, 2008 Tectum & ceiling tile removed to prepare for skimcoating, texturing and painting of ceilings and walls. June 2 -30, 2008