PLANNING FOR THE FUTURE OF DVB-T2 TRANSMISSIONS IN TURKEY IBRAHIM ILKER CUCIOGLU Electronic Engineer M.Sc.EE Deputy General Manager (Technical) ANTEN A.Ş.

Similar presentations


Presentation on theme: "PLANNING FOR THE FUTURE OF DVB-T2 TRANSMISSIONS IN TURKEY IBRAHIM ILKER CUCIOGLU Electronic Engineer M.Sc.EE Deputy General Manager (Technical) ANTEN A.Ş."— Presentation transcript:

1 PLANNING FOR THE FUTURE OF DVB-T2 TRANSMISSIONS IN TURKEY IBRAHIM ILKER CUCIOGLU Electronic Engineer M.Sc.EE Deputy General Manager (Technical) ANTEN A.Ş. Digitag Workshop, 14.November.2013 ISTANBUL

2 ANTEN A.Ş. (The DTT Network Operator ) History (…. Current Situation) TRT, Public TV, 1964 Terrestrial Broadcasting Network: Owned by TRT Managed by TRT Private (Commercial) Broadcasting, 1990 Terrestrial Broadcasting Network: -Powerful (National) < 15-20 staff/each Towers,stations,antenna systems… -Others(Regional,Local), Service from venders <2-3 person subcontractors < 2-3 person 2011, New Law « TV and Radio Broadcasting»  Switch to DTT  Licencing for DTT !- Terrestrial Broadcasting Network Operation (Whole Turkey, DTT) - One single company - Established by «National DTT licence holders» - Investment / Operation / Management 2012 (May), Anten AS -Present status «National Broadcasters» 15 broadcaster - TRT, Public TV -16 shareholders

3 ADVANTAGES OF ONE SINGLE OPERATOR MODEL ANTEN AŞ. The CAPEX (Investment costs) will be reduced The OPEX (Operation costs) will be reduced Will prevent waste of investment made by different companies/broadcasters The same professional level of quality, technical standarts Reduction of technical problems (interfences…) Reduction of towers in site/ Gathering all systems in one tower One single responsible/ respondent for RTUK One single responsible/ respondent for Broadcasters

4 TASKS FOR ANTEN AS 1.DEPLOYMENT PROJECT 2.TRIAL

5 DEPLOYMENT PROJECT FREQUENCY PLANNING BY RTUK BASIC INFORMATIONS ▫Mode: DVB-T2 ▫Reception Target : Indoor reception ▫Coding : 64QAM ▫FEC : 2/3 ▫Guard Interval : 19/256 ▫FFT Size : 32K ▫Pilot Pattern: PP4 ▫Channel Bandwidth : 27 Mbps

6 DEPLOYMENT PROJECT FREQUENCY/NETWORK PLANNING BY RTUK BASIC INFORMATIONS - 9 Mux (8 UHF, 1 VHF) planned - 7 Mux (UHF), Nationwide, tendered - 1 Mux, TRT - 5 Mux, National Private - 1 Mux, Regionals,Locals - 952 sites planned !- LAW NATIONAL BROADCASTER - 70% Population (Whole Country) REGIONAL BROADCASTER - 70% Population (Whole Region) MIN NETWORK (National) 379 SITE > 70 % POPULATION

7 DEPLOYMENT PROJECT 7 Mux / 379 Sites DTT NETWORK PLANNING Head – End National Broadcasters Reginal ( 4 / Region) * 7 Local Broadcasters ( 7/ City) * 81 Transmitter Sites - Site Coordinates ( Frequency Plan by RTUK) - EIRP (Max) ( Frequency Plan by RTUK) - Tower Heights (Max) ( Frequency Plan by RTUK) Tranmitter Powers, Antenna Sytems,Combining Systems,Energy Lines, Buildings, Site Communication/Management Systems,Redundancy……..

8 DEPLOYMENT PROJECT 7 Mux / 379 Sites DTT NETWORK PLANNING MANAGEMENT / OPERATION Optimized management model defined Employee, quantity, qualification defined CAPEX, Investment Costs OPEX, Operation Costs Site Serveys, in operation Existing Sites (Stations: Towers, antenna systems, buildings,energy…..) New Sites

9 TRIAL City: Ankara (Capital City) Population: 4.6m Area: 2.516km 2 Planned Site : 4 Planning Mode: SFN Area Definition: Urban No sea, no river Surrounded by mountains Higher buildings  concreat  glass covered buildings Rural Area (Far from downtown, in coverage) Close to co-channel interference Not so huge as Istanbul for traffic / easy to measure Enough SFN site (not few, not many) Existing stations Possibility to use R/L or fiber distribution instead of satellite

10 TRIAL Trial Project Prepared Site : 3 existing ( Planned : 4) Avaliable capacity in existing stations Simulations: Coverage & Interference Mux : 2 HD, 5 SD : 27 Mbps Distribution : Satellite Measurement : 2 set of measurement equipments - Vehicle : Outdoor measurement - Portable : Outdoor / Indoor measurement

11 TRIAL Outdoor Measurement / Vehicle Indoor Mesurement / Portable Set-Top-Box Monitor GPS TV ANALYSER 2m

12

13

14

15 TRIAL Outdoor Measurements : Coverage, Signal Field Strength Indoor Measurements : Indoor Reception Homogeneously Ankara Ground Floor → Top Different Points in a room Same axis / Opposite axises Report is in process

16 CONCLUSIONS TrialQuite Succesfull, some changes in power levels Gap Fillers Mobile < 50 kmph Evaluation / RTUK Antenna Set Top Box !