Presentation is loading. Please wait.

Presentation is loading. Please wait.

Www.visolve.com © 1995-2006 ViSolve.com All rights reserved. Privacy Statement April 21 2011 Oracle Disaster Recovery Implementation A Non-Technical Overview.

Similar presentations


Presentation on theme: "Www.visolve.com © 1995-2006 ViSolve.com All rights reserved. Privacy Statement April 21 2011 Oracle Disaster Recovery Implementation A Non-Technical Overview."— Presentation transcript:

1 www.visolve.com © 1995-2006 ViSolve.com All rights reserved. Privacy Statement April 21 2011 Oracle Disaster Recovery Implementation A Non-Technical Overview (Setting-up Oracle Disaster Recovery Environment on x86-64 Linux) ViSolve Migration Team services @ visolve.com (408)666.4320

2 www.visolve.com Present the Disk HA/DR Server Present the Disk Standby Instance Standby Database Restored Database New Disk Linux IA64 Linux x86-64 DB Instance Backup Files RMAN Backup Redo Log Shipping (Data Sync) Production Database Source Machine Target Machine Backup Disk/Tape 2. Backup the production database to the new disk using RMAN Backup. 5. Dismount the backup disk from the source machine. Mount the backup disk on the target machine. 6. Start the DB instance on the target machine. Restore the backup database using RMAN Restore. 7. Configure Oracle Data Guard on the restored database for High Availability and Disaster Recovery. 1. Add/mount a new disk on the source machine. Oracle Disaster Recovery Environment (Using Oracle Data Guard) 4. Manually create a DB Instance on the target machine. DB Instance The Disaster Recovery Environment is now setup using Oracle Data Guard 2 RMAN Restore 3. Configure (Oracle Data Guard) the Production Database as the Primary Database (requires few minutes of downtime). Primary Database 8. Switch the role of standby database to primary. Move the application database connection (requires database downtime) to the new primary database to complete the migration process. 9. Bring down the source machine. Setting-up a Disaster Recovery Environment During a Migration 10. If needed, build an additional server for HA/DR in the new environment using the same tools and process. We can show you a demo of this approach. Call us today to get access to our Oracle migration sandbox. NO PRODUCTION LOSS. BUSINESS CONTINUES AS USUAL. Primary Database Standby Database

3 ViSolve, Inc. 4010, Moorpark Avenue, #205, San Jose, California - 95120. Thanks for your time! Contact ViSolve today to know how we can help you services@visolve.com services@visolve.com (408)666.4320


Download ppt "Www.visolve.com © 1995-2006 ViSolve.com All rights reserved. Privacy Statement April 21 2011 Oracle Disaster Recovery Implementation A Non-Technical Overview."

Similar presentations


Ads by Google