Download presentation
Presentation is loading. Please wait.
Published byBrook Douglas Modified over 9 years ago
2
2010 Metal on the roof Installation of exterior doors Developed the Friends of Secesh board
3
Hal Sager developed this signage board 2010
4
Metal on the roof and doors installed
5
Looks good, keep the birds out
6
Snow is coming early
7
I’m not shoveling the driveway
8
2011 Framed inside walls living quarters Rough in electrical, added insulation Finished high bay with OSB sheathing Added skirting metal to exterior walls
9
Framing the quarters area
10
Let’s get the electrical in so we can put the insulation up
11
ALL ABOARD! Next stop Burgdorf
12
Door lower and skirting on ready for another winter
13
Yea! No fires this year
14
How do you shut it off?
15
Goodbye, see you next summer
16
2012 Added the wing addition to the building Living quarters (rough plumbing, sheetrock, texture and paint, electrical completed) Painted the high bay Applied log siding to front, sides and steeple
17
What would we have done, without this donated equipment
18
Get the level
19
Holy crap this is heavy
20
Not too fast, be careful
21
Looking good
22
Last one, not too fast
23
You pick it up and I’ll push
24
Looks good on this end
25
Wow, lag screw really long
26
Now we have shade
27
More storage for stuff
28
OK, we’re getting there
29
Just a few more pieces
30
You with no hair, can’t work here
31
Pretty impressive, wouldn’t you say
32
OK, last side and we’re done
33
One man job, no problem
34
Should we put a for sale sign on it
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.