CMS Tracker Week, CERN, 26-29 April 2005 27 Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Salvatore Costa Università di Catania and INFN – Sezione di Catania
2
27 Apr 2005CMS TrackerWeek - Module Production2 Salvatore Costa - Catania Outline 1.Global info on production bonding of the Modules 2.Global review of Module bonding quality indicators 3.Open issues 4.Selected highlights from individual Center reports
3
CMS Tracker Week, CERN, 26-29 April 2005 27 Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Global review of Module bonding quality that is, Module Pull Test results
4
27 Apr 2005CMS TrackerWeek - Module Production4 Salvatore Costa - Catania # Modules Pull Tested
5
27 Apr 2005CMS TrackerWeek - Module Production5 Salvatore Costa - Catania Mean pull forces
6
27 Apr 2005CMS TrackerWeek - Module Production6 Salvatore Costa - Catania Mean pull forces
7
27 Apr 2005CMS TrackerWeek - Module Production7 Salvatore Costa - Catania StDev/Mean of pull forces
8
27 Apr 2005CMS TrackerWeek - Module Production8 Salvatore Costa - Catania StDev/Mean of pull forces
9
CMS Tracker Week, CERN, 26-29 April 2005 27 Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Open issues
10
27 Apr 2005CMS TrackerWeek - Module Production10 Salvatore Costa - Catania Hybrid-related issues 1.Bonding problems on PA encountered while bonding APV’s to PA in some TIB hybrids [mentioned by Alan/Gabriella] Display additional warning in Pre-bonding section of DB Interface Faulty hybrids, with intermittent FHIT errors, erroneously sent to CERN from HAS, then to Gantry Centers and some already built into modules. [mentioned by Gabriella] All Gantry and Bonding/Testing Centers alerted I plan to generate from DB and distribute affected Module list
11
27 Apr 2005CMS TrackerWeek - Module Production11 Salvatore Costa - Catania ModProd DB Browser Tool At Gian Mario’s request, non-prod quality objects (modules, sensors, hybrids) now excluded:
12
27 Apr 2005CMS TrackerWeek - Module Production12 Salvatore Costa - Catania Jigs for TEC Module bonding TEC Center Module Types to bond (# Mod) Who made jigs (# jigs) Backup center for this Ring’s Modules Who makes additional jigs (# jigs) AachenR6Aachen (1)R3,R5p,R5sAachen (2) HamburgR1p,R1s, R3Hamburg (2/2/2)R7 Hamburg (2) Told Didier they can make jigs for other centers KarlsruheR5p,R5R3in preparation StrasbourgR7Strasbourg (1)R6Karlsruhe (1) ViennaR2p,R2sVienna (1)Not decided yet Can make R2 jigs for other centers ZurichR4 (1100)Karl./Zurich (2)R6, R7? Karl./Zurich (1+1) Has R7 jig on loan from Strasbourg We are continuing to monitor the preparation of attidional jigs for Center backup in TEC. This is a table already showed at last Meeting, but with updates added yesterday.
13
CMS Tracker Week, CERN, 26-29 April 2005 27 Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Selected highlights from individual Center Reports
14
27 Apr 2005CMS TrackerWeek - Module Production14 Salvatore Costa - Catania Catania: new facilities New bonding machine: Delvotec 6400 (100 kHz) –Since March 8 th –Oldest of 2 Hughes dismissed –Now in clean room: Delvotec, newest of 2 Hughes –Bonding times down: TIB34: 8’ 10” vs. 45’ + x TIB12: 12’ 15” vs. 65’ + x Backs: 15” vs. 1’ + x –Reliability improved: Machine failure rate: negligible Bonding failures: negligible PHL- (DEAD) channels: none so far –Experience: 45 modules bonded w/ new machine Programs for all module types ready: TIB34, TIB12, TIB12sl, TIB12sr (back/front/pulltest/after_pulltest) –Usable bonding parameters window narrower than in Hughes –Best Pull forces achieved: ~10g New operators –2 nd operator fully trained since last meeting already. –3 rd operator: Russian engineer with temporary contract.
15
27 Apr 2005CMS TrackerWeek - Module Production15 Salvatore Costa - Catania Catania’s Delvotec 6400
16
27 Apr 2005CMS TrackerWeek - Module Production16 Salvatore Costa - Catania Other Center’s highlights FNAL: Last 2 weeks found problems related to excessive flex of PA ends. Had to ask assemblers to move glue points. This helped but not yet satisfactory. Firenze: In some latest TIB modules dirty area of PA near end (but not at end) made bond difficult there. Padova: Uploaded pull test data after shipping modules to Pisa usual DB problem: pull test appears performed in Pisa recommendation: upload all of your data before shipping modules to another center Torino: Due to share with Alice had to change Delvotec’s U/S frequency from 100 to 60 kHz. New parameters. Similar performance. Vienna: Bonded 25 modules with new Delvotec 6400 (140 kHz). Pull forces were marginally better than 100kHz. Observes whiskers on 2 nd bond (on PA). Zurich: Machines now equipped with additional USB camera (+ PC) to ease the strain of looking all the time through microscope during bonding. Model details available.