Orbis Cascade Alliance
Alma Migration at the Orbis Cascade Alliance Joseph Kiegel
2
A Few Words About the Orbis Cascade Alliance
37 academic institutions in Oregon, Washington and Idaho Public and private institutions of a variety of sizes Community colleges Four year colleges Regional universities ARL universities Governed by a Council of 37 library deans and directors
3
Deciding to Migrate to a Shared ILS
4
Alliance Goals for a Shared ILS
Continue the core mission of managing, building and sharing a combined collection and offering first-rate service Advance future collaborative work Collaborative technical systems initiative “A new kind of system and a new way of operating” To create new services, integrate with other systems, create new workflows and extract data
5
First Step: RFI To aid in planning, the Alliance sought information from organizations on their ability to provide library management services in a consortial environment RFI Timeline Released: February 2011 Responses due: March 2011 Alliance determines next steps: May
6
Results of the RFI A study team analyzed and summarized RFI responses
It concluded: Market is mature enough, although products are new Several vendors have a vision that is consistent with the Alliance’s Vendors are mature and experienced Core functionality is present, but familiar features of the old system may be lacking Alliance will need to commit to a high degree of collaboration with a vendor to get the best results
7
Next Step: RFP The RFI study team recommended that the Alliance proceed with an RFP Council approved it in July 2011 Since the Alliance expected to consider new approaches, the RFP was intentionally broad and focused on outcomes rather than detailed functional requirements
8
RFP Timeline RFP was schedule-driven rather than results-driven
RFP released: January 2012 Proposals due: February 2012 Product demonstrations: April 2012 Negotiation phase: May-June 2012
9
Opportunities for Staff Comments
December 2011 – comments on a draft RFP February 2012 – draft scripts for product demonstrations April 2012 – comments on product demonstrations
10
Result of the RFP April 2012 – Innovative Interfaces and Ex Libris were invited to the negotiation phase July 2012 – Alliance Council chose Ex Libris “Ex Libris was a clear standout and judged to be the preferred option” December 2012 – contract signed with Ex Libris
11
Organizing for Implementation
12
Implementation Timeline
Implementation started in January 2013 Schedule driven rather than results driven Four cohorts of libraries, with six months each Cohort 1: six libraries, live in June 2013 Cohort 2: eleven libraries, live in December 2013 Cohort 3: ten libraries, live in June 2014 Cohort 4: ten libraries, live in December 2014 Cohorts were based on institution size and readiness
13
Alliance Staffing for Migration
Shared ILS Program Manager Hired a temporary manager, and then recruited for a permanent one Shared ILS Implementation Team Chaired by the Program Manager Staffed by chairs of working groups Working groups were organized on the model of the former ILS: Acquisitions, Cataloging, Serials/ERM, Circulation and Resource Sharing, Discovery, Systems, and Training
14
Functions of the Working Groups
Assisted each cohort with migration Organized Alliance reporting of problems and enhancements Provided a means of communication Peer to peer From the Implementation Team out to libraries Developed some Alliance-wide procedures
15
Working Group Methods 6-8 members and 37 institutional representatives
Worked by and regular telephone meetings In-person meetings were rare As migration proceeded, institutional representatives were added to the phone calls 20-30 participants on a call was normal
16
Written Communication
Regular updates from the Program Manager Periodic from the Implementation Team Alliance Web site for shared documentation Organized by working groups In reality, Google Drive was used most by working groups
17
Training Plan Vendor provided training for Cohort 1
Expectation that Cohort 1 would train Cohort 2 was not met Vendor provided training for Cohort 2 Alliance provided the greater part of the training for Cohorts 3 and 4 Cohort 1 trained 3, and Cohort 2 trained 4
18
Training Methods Training model was train-the-trainer
Those trained were expected to repeat this training in their libraries Most training was online via webinars Webinars were recorded and available later “Functional Workshop” was used for each cohort 2-3 days of in-person training Workflow specific training
19
Additional Teams and Programs
Collaborative Technical Services Team Center of Excellence
20
Collaborative Technical Services Team
Charged with exploring and implementing shared practices in technical services In fact, it spent most of its time on ILS migration Focused on policy rather than ILS implementation Also organized by working groups: Acquisitions, Cataloging, Serials/ERM, and Training
21
Center of Excellence Meant as a development partnership with the vendor Focused on the development and enhancement of Alma and Primo and best practices for consortia Relatively slow to get off the ground and did not have a significant impact on the migration itself
22
Challenges: Organizational and Technical
23
Training Did Not Meet Expectations
Often demonstration rather than instruction Done in sandboxes that were not fully configured or functional Manuals showed how to push buttons, not how to accomplish tasks Little explanation was given on how Alma really works
24
Documentation Was Hard to Manage
Alliance established a passworded Web site for migration documentation, organized by working group But the goal of broad access and semi-decentralized control was never met Working groups used more convenient alternatives, such as Google Drive
25
Details of the Migration Process Changed
Migration procedures and data forms changed from cohort to cohort Each cohort was advised by the one before it Earlier cohorts were no longer up to date
26
Production Systems Not Ready at Go-Live
Libraries were not given full access to configuration menus until after go-live As a result, some functions did not work immediately, e.g. EDI
27
Some Functions Were Not Fully Working
Import profiles (loaders) did not work reliably Shared database (Network Zone) was new and not fully functional Local bib fields were not available for Cohort 1 Bound-withs were unreliable OCLC loading was not working well Some import profiles did not work with the Network Zone
28
Organizing for the Post-Migration Period
29
Organization Structure
Alliance is now organized by programs Collaborative Workforce Content Creation & Dissemination Resource Sharing Shared Content Discovery & Delivery Systems
30
Responsibility for Alma and Primo is divided among teams
Acquisitions and Resource Management: Collaborative Workforce Primo and Alma Fulfillment: Discovery & Delivery Management of vendor relations: Systems
31
Lessons To Be Learned
32
Communication is King Provide some detail in your vision If there is system functionality you want, include it in the RFP Give yourself a realistic amount of time for implementation
33
Organize committees on the model of the new system rather than the old one
Provide a document management system that is flexible and easy to use Provide backup for staff working intensively at the consortial level
34
More Information Available