2
Production Dev. Post Production Release Quality Assurance Marketing
3
* Testing game * Why? * Ensure expectations are met * When? * Continuously * Who? * Automated * Developers * Sponsors * Internal QA * External QA * Publisher QA * 1 st Party QA
4
* A – Critical * Crashes, features inaccessible, progress bugs * B – General Bug * Non-Blocking * C – Cosmetic * “Text is difficult to read on some screens” * D – Wishlist * “Player should be able to fly a unicorn”
5
ProductionAlphaBetaMaster
6
* Example: 24 month project * Alpha – 12 weeks * Beta – 12 weeks * Master – 6 weeks Production AlphaBeta Maste r * Example: 12 month project * Alpha – 6 weeks * Beta – 6 weeks * Master – 6 weeks
7
* Example: MMO * Alpha – 12 weeks * Beta – 36 weeks * Master – 6 weeks Production AlphaBeta Maste r * Example: iOS * Alpha – 2 weeks * Beta – 2 weeks * Master – 2 weeks
8
* Christmas Release * Alpha – mid June * Beta – end of August * Master – end of October Production AlphaBeta Maste r
9
* Feature Complete * Placeholder Art * Design complete * All features are playable but require polish * No New Features After This Point!
10
* Internal testing * Fixing Bugs * Optimisation * Polishing Features * “Lazy” features * Sound * UI * FMV * Non-English languages
11
* Game is playable end-to-end * No blocking bugs * Code Freeze * Multi-player * F&F Beta * Closed Beta * Open Beta
12
* External Testing * Fixing Bugs Only * Optimisation * Installers/Bundles * Polishing Features * Writing manual * Closing out box artwork * Compliance Fixes * Compatibility Fixes
13
* Game is ready for submission or release * Bug free * No A’s or B’s
14
* Submission to 3 rd party * Sony, Microsoft, Apple, Steam * Ratings boards * PEGI (Europe), ESRB(USA),USK (German), CERO(Japan), ACB (Australia)
15
Sub1 fix Sub2 Master
16
* Typically 2 weeks in, 1 week out * Complete blackbox * Large 1 st party test teams * Bugs are scored, high scores fail * Typically, 2 attempts only
17
* No approval, no release * No control * Bottleneck at peak times * Can be bumped up/down * Underwrite to get approval for large publishers
18
* Game goes in a box/online * That’s it!
19
* Pre-Alpha * Alpha * Pre-Beta * Beta * Optional: F&F, Closed, Open * Master * Pre-Submission * Submission 1 * Submission 2
20
ManufactureDistributionRetail
21
* Physical Media duplication * DVD, Bluray – Sony DADC * Cartridges * Batch sizes * Printed Media duplication * Manuals, Box artwork * Packaging * DVD cases, Gift boxes * Assembly
22
* Delivery of parts to assembly * Final delivery to store * Pre-Orders: Delivery from store to home
23
* Manufacture * DVD/Bluray: 1-2 week * Distribution * To retail: 2-3 days ManufactureDistributionRetail
24
* Ongoing marketing support * Mothballing * DLC * Maintenance * Patches * Online Support
25
Production Dev. Post Production Release Quality Assurance Marketing