Download presentation
Presentation is loading. Please wait.
Published byDerrick Bishop Modified over 9 years ago
1
Problem Statement Proposed Solution Key Considerations Laboratory Reports Entire Solution Phase I Solution Conclusion Design Team Jonathan Correia, Sean Heckathorne, Jeff Quinn Flexible Manufacturing System Classroom Laboratory Questions
2
Project Need ► Current Manufacturing Systems and Techniques (MIMU530) lab experiments do not adequately relate classroom theory to practice or expose students to a broad enough range of manufacturing techniques. Problem Statement Proposed Solution Key Considerations Laboratory Reports Entire Solution Phase I Solution Conclusion Questions
3
Project Statement ► To create a set of laboratory experiments that satisfy the need to integrate classroom teachings with laboratory practices. ► Understand the demands and expectations of laboratory objectives and formulate strategies to satisfy them. ► Design a flexible manufacturing system to introduce students to a practical application of traditional and state of the art manufacturing techniques. Problem Statement Proposed Solution Key Considerations Laboratory Reports Entire Solution Phase I Solution Conclusion Questions
4
Our Goals ► ► Design a set of lab experiments to allow students to demonstrate knowledge of course objectives ► ► Research and recommend lab configurations and equipment that satisfy the demands of the lab procedures ► ► Identify and address missing links and voids within the equipment configurations that require unique solutions Problem Statement Proposed Solution Key Considerations Laboratory Reports Entire Solution Phase I Solution Conclusion Questions
5
Project Benefits ► Creation of a set of pedagogically sound laboratory exercises to be used in the MIMU530 course ► Integration of classroom theory and hands-on practice ► Addition of problem solving aspect to lab experience ► Recommendation of equipment and configurations to satisfy demands of long-term laboratory needs ► A specification for Phase I laboratory development - definition of equipment and operating procedures required for implementation ► Design of enabling technologies for implementation of Phase I Problem Statement Proposed Solution Key Considerations Laboratory Reports Entire Solution Phase I Solution Conclusion Questions
6
Overview ► Demonstrate and understand practical measure and calculation of process performance metrics WIP, cycle time, MLT, utilization, production rate ► Analyze the process performance and recommend improvements ► Gain understanding of manufacturing configurations and how they relate to process performance Storage buffers, batch vs. flow, product customization (pull), lean manufacturing Problem Statement Proposed Solution Lab Experiments Laboratory Reports Entire Solution Phase I Solution Conclusion Questions
7
Procedures ► Lab 1 – Effects of Storage Buffers in Assembly Lines ► Lab 2 – Effects of Batch Production in Assembly Lines ► Lab 3 – Effects of Customization in Assembly Lines ► Lab 4 – Applying Lean Tools to an Assembly Line Problem Statement Proposed Solution Lab Experiments Final Phase Solution Entire Solution Phase I Solution Conclusion Questions
8
Layout Decision Matrix Problem Statement Proposed Solution Lab Experiments Final Phase Solution Entire Solution Phase I Solution Conclusion Questions
9
“U” Shaped Layout Problem Statement Proposed Solution Lab Experiments Final Phase Solution Entire Solution Phase I Solution Conclusion ConveyorsCNC MachinesRobotsRobot Reach Questions
10
Design Problem Statement Proposed Solution Lab Experiments Final Phase Solution Phase I Solution Conclusion Conveyor System Sections Workers Questions
11
Design Problem Statement Proposed Solution Lab ExperimentsFinal Phase Solution Phase I Solution Conclusion Questions
12
Conveyor Bridge Problem Statement Proposed Solution Lab ExperimentsFinal Phase Solution Phase I Solution Enabling Technologies Conclusion Questions 2.75” Gap Conveyor Conveyor Drive Shaft Support Plates Timing Pulleys and Belt Conveyor 4X Sealed Bearing 4X ½-20 SHCS ½” Spacers
13
Support Calculations Problem Statement Proposed Solution Lab Experiments Final Phase Solution Phase I Solution Enabling Technologies Conclusion Questions Tourque = Timing Belt Length = Stress Analysis = approx. 2.4e+5
14
Accomplishments Problem Statement Proposed Solution Lab Experiments Final Phase Solution Phase I Solution Enabling Technologies Conclusion ► Four lab experiments written and ready for implementation at the next course offering ► Final phase system design in place ► Phase I design refined and ready for implementation ► Conveyor gap solution designed and ready for testing and implementation Questions
15
Future Consideration Problem Statement Proposed Solution Lab Experiments Final Phase Solution Phase I Solution Enabling Technologies Conclusion ► Purchase of Phase I equipment for implementation ► Continue research into machines that will satisfy laboratory objectives ► Research computer programs to control machine automation ► Build prototype of conveyor bridge and test in the system ► Maintain laboratory experiment objectives while altering the procedure to include new machines Questions
16
? Problem Statement Proposed Solution Lab ExperimentsFinal Phase Solution Phase I Solution Enabling TechnologiesConclusion Questions
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.