1 WECC TEPPC Meeting SWAT Update
Western Electricity Coordinating Council Transmission Expansion Planning Policy Committee WECC TEPPC Meeting SWAT Update Robert Kondziolka Salt River Project November 19, 2009 Phoenix, Arizona TEPPC SWAT Summary - R. Kondziolka

2 SWAT Footprint One of the WestConnect Sub-Regional Planning Groups
SWAT Footprint One of the WestConnect Sub-Regional Planning Groups SWAT Southwest Area Transmission TEPPC SWAT Summary - R. Kondziolka

3 Transmission Projects in WECC Regional Planning, Path Rating Process, or Development
Chinook Zephyr TransWest Express SWIP Great Basin Project High Plain Express Pinal West to Pinal Central Pinal Central to Browning Pinal Central to Tortolita TS9 to Pinnacle Peak Palo Verde to Sun Valley Sun Valley to TS9 SPPR ON-Line Navajo Transmission Project Segment 1 Palo Verde–Devers II California Portion Tres Amigas Santa Fe Palo Verde-North Gila II SunZia South Line TEPPC SWAT Summary - R. Kondziolka

4 EHV Transmission Upgrades In Development
Nevada 2009 625MW Energized To Intermountain Utah To Celilo Harry Allen Crystal California Marketplace Mead McCullough Navajo 2009 625MW Energized Eldorado 2010 600MW Four To Midway Corners Mohave Yavapai Adelanto Moenkopi Victorville Sylmar Vincent Peacock Lugo Cholla Rinaldi Toluca Mira Loma Arizona Coronado Serrano Devers 2009 400MW Valley Perkins Westwing DPV2 Project Palo Verde Rudd Miguel Imperial Valley Harquahala Liberty North Gila Kyrene Silver Jojoba King Saguaro +/- 500 kV DC line 500 kV line 345 kV line Major Substation Major Power Plants 500kV Line Upgrade TEPPC SWAT Summary - R. Kondziolka

5 Status of Major New Transmission Projects
Project Name Voltage Capacity Proposed In-Service Sponsor Status Pinal Central to Browning 500kV 1400MW nd Qtr SRP In Construction Pinal West to Pinal Central nd Qtr In Design & ROW Acquisition Palo Verde to TS5 (Sun Valley) 650MW APS TS5 (Sun Valley) to TS9 1200MW nd Qtr TS9 (Raceway) to Pinnacle Peak 1000MW 2010 – 4th Qtr Arizona Gateway South (Double Circuit) 345kV 2000MW 2014 TEP In Perpetual Federal Permitting Navajo Transmission Project 1500MW 2011 DPA In Path Rating Study Process Palo Verde to North Gila II 1250MW Palo Verde to Devers II (California Only) 2012 – 4th Qtr SCE In Siting & Permitting TransWest Express (Bi-Pole DC) 600kV 3000MW 2015 Anschutz In Siting & Permitting & Path Rating Chinook and Zephyr (Bi-Pole DC) 6000MW TransCan Pinal Central to Tortolita Easrtern Nevada Transmission Intertie th Qtr NVEnergy Great Basin Energy Project (SWIP) 1650MW th Qtr LS Power Project kV MW 20XX ID I SunZia Southwest Trans Project (2 Circuits) 2013 SW Power In Path Rating Process & Permitting High Plains Express Initiative (2 Circuits) 3500MW Xcel Feasibility Studies TEPPC SWAT Summary - R. Kondziolka

6 SWAT Summary - R. Kondziolka
SWAT 2009 Progress CRT Subcommittee DPV2, Harcuvar Project, El Dorado Valley RMR Studies for Yuma and Mohave counties SATS Subcommittee 2009 study work finalized Short Circuit Work Group Perfecting database and implementing small areas Expanding area to include southern California NM Subcommittee Focusing efforts through Renewable Transmission Task Force Wind collector and integration system SWAT Renewable Transmission Task Force ARRTIS (Arizona Renewable Resource and Transmission Identification Subcommittee) – Report Approved Finance Subcommittee – Report Approved Definition of Renewable Transmission Project TEPPC SWAT Summary - R. Kondziolka

7 SWAT Summary - R. Kondziolka
SWAT 2009 Progress CATS HV Subcommittee 2009 Study Report Finalized and Approved Development of corridors with cities and county CATS EHV Subcommittee Development of ACC BTA Studies Transmission Corridor Planning Work Group Common Corridor Structure Separation Task Force Report Approved BLM Arizona Restoration Design Energy Projects Western’s Transmission Infrastructure Program (TIP & WARP) Arizona Corporation Commission Biennial Transmission Assessment April & June workshops on transmission lines to support renewables Utilities filed reports identifying top 3 renewable transmission projects TEPPC SWAT Summary - R. Kondziolka

8 SWAT Summary - R. Kondziolka
TEPPC SWAT Summary - R. Kondziolka

9 SWAT Summary - R. Kondziolka
TEPPC SWAT Summary - R. Kondziolka

10 SWAT Summary - R. Kondziolka
TEPPC SWAT Summary - R. Kondziolka

11 SWAT Summary - R. Kondziolka
TEPPC SWAT Summary - R. Kondziolka

12 SWAT Summary - R. Kondziolka
TEPPC SWAT Summary - R. Kondziolka

13 El Dorado Valley Study Group
SWAT Organization Chart Proposed Changes 11/3/09 Josh Johnston Consolidate into one subcommittee Convert to subcommittee El Dorado Valley Study Group TEPPC SWAT Summary - R. Kondziolka

14 Western Electricity Coordinating Council
Transmission Expansion Planning Policy Committee Questions? Details Contact Information Robert E. Kondziolka (602) TEPPC SWAT Summary - R. Kondziolka