1 Frequency Responsive Reserve Process Update
W. Shannon Black Chair, WECC FRR Drafting Team

2 Convened to Draft a “Standard”
Examined the data available Determined Current response is adequate Data synchronization concerns Varying scan rates Resulted in forced normalization of data Resulted in some interpolation

3 Decided on “Criterion”
“Process for Developing and Approving WECC Standards” (Step 3, Page 4) “If the [SDT] determines, by majority vote, that a new or revised Standard is not needed, it will prepare an explanation in consultation with the Standards Request Routing Committee and post it on the WECC website…”

4 Moving Forward Current Option Post the criterion
November 08 Answer Comments / Repost as needed Three iterations contemplated December 08 through April 09 Post final Criterion May 09 OC Votes June 09 Board Votes July 09 Implementation Period

5 Parallel Path / 7 Month Delta
Parallel Option Draft a new SAR March 2009 SAR addresses retirement of BAL-02 SAR includes final criterion WECC Staff drafts compliance May 2009 Table top test of the criterion June 2009 Finalize SAR and convene a team October 2009 WECC posting / approval November October 2010 “Proposed Parallel Outcome” NERC / FERC approval March March 2011 Implementation Period Current Option Post the criterion November 2008 Answer Comments / Repost as needed Three iterations contemplated December 2008 through April 2009 Post final Criterion May 2009 OC Votes June 2009 Board Votes July 2009 “Would have been” NERC / FERC approval August August 2010 Implementation Period

6 Questions?