WV/VA issued permits Forest Service blocked line MN/WI issued permits Land owners sued AZ issued issued permit for TEP line Forest Service did not issue permit CA ordered Tehachapi construction FERC denied approval CT issued permit with conditions Developer didnt meet permit conditions
3
3 Frontier ( MOU ) Northwestern AMPS (Detailed study underway) Palo Verde – Devers II (Permitting) Navajo (Permitting) John Day-McNary (Wind integration study) Northern Lights TransWest Express (Announced 11/05) WAPA/TransElect/WIA (Expressions of interest 11/05) MT-AB intertie (EIS underway) Tehachapi (FERC partial denial) Green Path (Announced 11/05) Sunrise Powerlink (Application filed 12/05)
4
Open, peer review process of updating database Document shortcomings in existing models and invite fixes Open repository and web briefings on all transmission plans in the Interconnection Support information needs of sub-regional planning efforts Continue to provide analysis for DOE on congestion in the Western Interconnection Peer review congestion analysis being delivered to DOE this year Public database on projects to relieve congestion on DOE- designated congested paths Annual update of analysis of historical flow data Next Steps for WECC to Implement Open Source Transmission Planning
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.