WECC Interchange Tool (WIT) Overview for WECC Board of Directors December 7, 2007 “Your Energy, Our Solutions” Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

2 Open Access Technology International, Inc.
Trade Secret This document and attachments contain confidential and proprietary information of Open Access Technology International, Inc. This information is not to be used, disseminated, distributed, or otherwise transferred without the expressed written permission of Open Access Technology International, Inc. Proprietary Notice All OATI products and services listed are trademarks and service marks of Open Access Technology International, Inc.  All rights reserved. Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

3 WIT Project Overview The WECC Interchange Tool (WIT) is a WECC solution providing Interchange Authority (IA) functions for the Western Interconnection. The Project is divided into three phases for implementation Phase I: Single E-Tag authority for WECC Enhanced E-Tag validation for WECC WECC Registry based on NERC TSIN SRD E-Tag based Balancing Authority (BA) Net Scheduled Interchange (NSI) calculations and reports EIDE API Production Cutover January 24, 2007 Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

4 WIT Project Overview Phase II: BA Net Actual Interchange (NAI)
BA Inadvertent Interchange (II) calculation Provide NERC II reporting Production Cutover October 17, 2007 Phase III: Ramped NSI minute values for BA’s AGC Estimated Completion February 2008 All Phases have met specification requirements on time and on budget. Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

5 WIT System Overview WECC Registry OATI Tagging WIT Interface WIT EIDE
Adjacency Definitions Approval and Notifications OATI Tagging WECC Tag Authority Service Frontend Tag Validations before creation WIT Interface Tag based Schedules Net Checkouts Reporting WIT EIDE PutMeter PutSchedule GetSchedule Includes: Production Systems Development Systems Hot-Standby System Disaster Recovery System Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

6 WIT– Interchange Summary
Adjacent Nets (Schedule & Actual) , GCA/LCA Nets, Path Nets Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

7 WIT Performance to Date
WIT Contract No Single Point of Failure The WIT system must be fully redundant, including at least dual internet connections using separate providers. The WIT system must be configured in either a parallel or hot standby configuration unless otherwise mutually agreed upon between WECC and OATI WIT Contract Availability WIT availability will be 99.0% measured over a rolling 30-day period. The 99.0% availability requirement will apply only to WIT elements that are not part of OATI’s Authority Service. The Authority Service will comply with NERC availability requirements for Authority functions NERC E-Tag Specification 99.5% availability per WEQ-004 WECC Registry, WIT and OATI Tag Authority Service all far exceed these minimum requirements. 640 System Users Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

8 WIT – Schedule Creation
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

9 WIT – Tie Data Upload Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

10 WIT Project – BA Tie-Data Transfer Status
As of : Providing Production Data GCPD – Production up and running now LDWP – Production up and running now NWMT – Production up and running now PGE – Production up and running now PSCO – Production up and running now SCL – Production up and running now BCTC – Production up and running now AVA – Production up and running now AESO – Production up and running now CHPD – Production up and running now IID – Production up and running now SRP – Production up and running now SPPC – Production up and running now NEVP – Production up and running now WALC – Production up and running now PNM – Production up and running now AZPS – Production up and running now TEPC – Production up and running now EPE – Production up and running now IPCO – Production up and running now BPAT – Production up and running now PACE – Production up and running now PACW – Production up and running now DEAA/GRMA/HGMA – Production up and running now. (Only Providing Data Once a Day - needs to be hourly) TIDC – Working on implementation.  (Manually uploading data currently - hourly) DOPD – Production up and running now SMUD – Production up and running now WACM – Production up and running now CISO – Working on implementation (Manually uploading data currently - once a day) CFE – Production up and running now PSEI – Production up and running now Not Providing Data TWPR – Working on implementation WAUW – Working on implementation Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

11 WECC Registry – Adjacency Summary
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

12 WECC Registry Statistics
Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

13 WIT Project – Future Enhancement Ideas
Unified WECC Time Error Correction Calculation WECC Reserve Requirement Calculator Provide “Real-time” Nets for System Security Analysis WECC Path OTC Management and Monitoring Additional Tag Validations Explicit Path Adjacency Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

14 WIT Project Contacts WECC Point of Contact Eric Langhorst (WECC)
ESWG Project Team (Phase II) Mark Hackney, for general questions (AZPS) Jim Hansen, for EIDE questions (SCL) OATI Contact Mark Nielson, for technical questions (OATI) Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.

15 Open Access Technology International, Inc.
Questions? “Your Energy, Our Solutions” Proprietary and confidential. Do not copy or distribute without permission from OATI - © OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.


Download ppt "Open Access Technology International, Inc."

Similar presentations


Ads by Google